My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-01-03_REVISION - C1981038
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981038
>
2008-01-03_REVISION - C1981038
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:20:31 PM
Creation date
1/20/2009 2:41:08 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
REVISION
Doc Date
1/3/2008
Doc Name
Memo and Reclamation Cost Estimate
From
Jim Stark
To
Joe Dudash
Type & Sequence
RN5
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
oti <br />Bowie No. 1 Mine C-81-038 <br />Partial Phase I Bond Release SL-03 <br />Applicable Cost Summary Sheet <br />Task: 000 Site: Bowie No. 1 Mine Date: 15 Nov 07 User: JRS <br />Permit Action: Partial Phase I Bond Release SL-03 <br />- - County_ _ Delta <br />Description: Cost Summary File Name: C-1981-038 <br />Task Reclamation Task Description Hours Direct Cost <br />201 Seal Loadout Wells Not Released $0.00 <br />202 Demolish and Remove Structures at Loadout 525.00 $1,554,653.00 <br />203 Combined with Task 202 0.00 $0.00 <br />244 Haul Footprints of Loadout Stockpiles to Refuse Area <br />-- Not Released <br />- $0.00 <br />- <br />205 - - <br />-Rip Coal Storage/Loadout Area Not Released $0.00 <br />206 Excavation/Grading at Storage Area and Loadout Not Released $0.00 <br />207 Grade Railroad Spur Not Released _ $0.00 <br />208 Finish Grade Railroad Spur Not Released $0.00 <br />209 Replace Topsoil from Stockpile to Truck Dumb Station Not Released _ $0.00 <br />210 pjle Areas <br />Reseed Train Loadout and Coal Stock Not Released $0.00 <br />211 _ <br />Remove Coal Stockpile Pond Not Released <br />212 Remove Train Loadout Pond Not Released $0.00 <br /> Total Indirect Costs $1,554,653.00 <br /> Liability Insurance (1.55%) ,_._ <br /> Performance Bond (1.05%) $16,323.86 <br /> <br />Profit (100/.) <br />..... _ $155 465 30 <br />- - - '- . - '-- -- - <br />- <br /> <br />_ <br />Job Su _enntendant (300 hours $37 50/hour) <br />525.00 <br />__ - .. __- .. _ _ . <br />$11,250.00 <br />_ •_- - _.__ _ ___ -.. _.__ _ <br /> Total Contract $1,761,789.28 <br /> Engineering Fees (4.25%) $74,876.04 <br /> Administrative Costs (3.25%) $57,2518.15-- <br /> Total Applicable Loadout Liability $1,893,923.47 <br />Summary Sheet Page 1 of 1
The URL can be used to link to this page
Your browser does not support the video tag.