My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-01-08_REVISION - C1981038
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981038
>
2008-01-08_REVISION - C1981038
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:20:45 PM
Creation date
1/20/2009 2:40:07 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
REVISION
Doc Date
1/8/2008
Doc Name
2nd Adequacy Review
From
DRMS
To
J.E. Stover & Associates
Type & Sequence
RN5
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bowie No. 1 Mine C-81-038 Partial Phase I Bond Release SL-03 <br />Task: 000 ? Semite: Bowie No. I Mine Date: 21 Nov 07 User: JRS <br />_ <br />Permit Action: _ <br />Partial Phase I Bond Release SL-03 - -- -j County <br />-;Delta _ <br />Description: _ {'C-ostt Summary Name: ';C-1981-038 - <br /> r - <br />Task ; Reclamation Task Description Hours <br />------ ------ Direct Cost <br /> <br />074 -Recut Haul Road Ditches 3.59_ - $502.00 <br />_ <br />075 -Construct 2730' of 3' Ditches__ _ 6.21 <br />--?-- $868.00 _ <br /> <br />076 <br />^Construct4310 of 12 Ditches - -- 35.96 <br />-? - ------ ! $5,021.00 <br />- <br /> <br />078 <br />-Backfill OVM Pipeline Removal Trench <br />0.97- 037.00 <br />- $1, <br />-- <br />079 !-Establish Irrigation Ditch at Storage and Loadout - j_- 1.71 $239.00_- <br />_ _ <br />081 -Riprap Placement 4.04 $15,838.00 <br /> <br />085 _- - - <br />1 <br />d Regrade Pond <br />an <br />;-Bac fill _ I -___3.05__ $632.00 - <br />086 _ <br />_ <br />_ <br />_ <br />-Backfill and Regrade Pond 2 2.47 - -! _$514.00 <br />_ _ <br />087 - - <br />~-13ackfll and Regrade Pond 3 __ 2.52 _$524.00- <br />__ _ <br />088 _ <br />-- - <br />Backfill and Regrade Pond 4 - <br />------- 2.91 <br />- $605.00 <br />00 <br />503 <br />$1 <br />089 Remove Concrete Pond Dams 10.77 . <br />, <br /> <br />091 --------- -- <br />-Backfill and Regrade Waste Pile Pond ? 2.31 --$479.00 <br />_ <br />092 -Backfill and Regrade Timber Storage Pond -- - 2.83 - $586.00 <br />093 ade Coal Stockpile Pond <br />i-Backfill and Re 1.00 $208.00 <br />- <br />095 - <br />----- <br />-Backfill and Re grade Pond W- 1 2.88 $597.00 <br />-- <br />096 ---- ---- -Backfill and Regrade Pond W-2 2.88 - $597.00_ <br /> <br />100 - <br />from Stockpile to -- Waste Disposal ---- Area <br />-Replace - Topsoil <br />4.89 <br />- - - - $5,256.00 <br />101 - <br />-Move Fill Topsoil Pile into Stockpiled Area --- -; ___ 25.75_- r_ -__$27,674.00 <br />102 -Replace Topsoil from Stockpile to O_V_WM_ 47.66 $51,211.00_ <br />103 -Replace Topsoil from Stockpile to Replaced Fill 11.49__ - ?_ $12,349.00 - <br />104 -Replace Topsoil from Stockpile to OVWM Vent Shaft Access 2.84 $3,055.00- <br /> <br />105 ---? -- <br />'-Haul Stevens Gulch Topsoil to OVM - 5.94 <br />_- - $10,167.00 <br />_ <br />106 -Redistribute Topsoil at Truck Dump Station 0.44- - _ $478.00 <br />_ <br />107 -Replace Topsoil from Stockpile to OVM Main Diversion Ditch 0.44 $550.00 <br />108 -Replace Topsoil from Stockpile to Remaining Mine Site 12.71 <br />_- <br />$20,008.00 <br />109 _ - <br />Re place Topsoil from OVWM Slide Area <br />--------------- - 0.30 <br />---+--- - _ _$324.00- <br />- <br />110 ---------- - <br />-Replace Topsoil from Stockpile to TR-38 Drill _Pad_ 0.09- _ -; _$_95_00 _ <br />111 _ <br />TR-38 Light Use Road <br />f-Replace Topsoil from Stockpile to - 0.81 $874.00 - <br />__ <br />j l2 _ <br />-Replace Topsoil from Stockpile to Pond W- 1 1.55 _ T _ $321.00 <br />113 Replace Topsoil from Stockpile to Pond W-2 _ _ - <br />?- - --- -' 1.55 <br />1----------- $321.00 <br />-?-------------- <br />- - -- ---- <br />118 ----<_ ---- ---- ---- ---- ----------- -------- <br />Seal OWM and OVWM Vent Shafts ---- -- <br />120.00 -----=----------------- <br />j $59,057_00 <br /> <br />- - -- -- --- - <br />125 ----- - ------ <br />- --- -- - - - --- <br />-- - - _--_-- - <br />-Plug and Seal All Boreholes <br />105.00 <br />- - - --_---- <br /> <br />- _-;-- - __$$35,559.00 <br />---- <br />130 ?- ------ ---- <br />-Revegetate OVM <br />20.00 <br />$33,701.00 <br />-- - - - <br />131 - <br />-Revegetate OVWM 24.44 _ <br />$4.1,182.00 <br />_ <br />-- <br />132 <br />-Revegetate Remainder of Mine Site <br />82.28 <br />$58,870.00 <br />--- <br />- --- <br />133 _ <br />-Revegetate Narrowed Haul Road Outslo _e <br />6.76 <br />_- $11,391.00 <br /> <br />_ __- <br />--- <br />137 - <br />' -Demolish and Remove All Structures <br />400.00 <br />$293,402.00 <br />- <br />146 .-MobilizelDemobilize Equipment for Initial Reclamation 12.29_- $44,266_00 <br />- - --- - <br />147 - -- - - -- - - ----- - <br />'-Mobilize] Demobilize Equipment for Pond Cleaning 6 00 <br />$2__,422..00 _- <br />148 -MobilizelDemobilize Equipment for Pond Removal <br />iz - -6.00_ <br />- _ $3,026.0 <br />- <br />149 -- - <br />;-MobilizelDemobilize Equipment for Site Maintenance <br />24.00. ---. <br />_ _ _$43. _,_ 001_.00_ __. <br />Summary Sheet Page 2 of 3
The URL can be used to link to this page
Your browser does not support the video tag.