Laserfiche WebLink
SCANNED Bowie No. 1 Mine C-81-038 Partial Phase I Bond Release SL-03 <br />Task: 0 <br />00 - <br />Site: Bowie No. 1 Mine 'Date: 21 Nov 07 _ User: JRS <br />. <br />Permit Action: - <br />Partial Phase I Bond Release SL-03 - - <br />' County Delta <br />'Description: , <br />'Cost Summary File Name: IC-1981-038 --- <br /> <br />Task I------- ------- <br />Reclamation Task Descriution i <br />Hours <br />Direct Cost <br />-- <br />001 '-- ?---- - <br />j-Push Fill from Zone I-A to Zone 4-A at C&S Bench <br />197.83 <br />$212,587.00 <br />' <br />002 _ <br />Push Fill from Substation Zone 1-D to Road Cut Zone 2-D I 0.35 $377.00 <br />003 -Push Fill from Substation Zone 1-D to Road Cut Zone 2-E 0.63 $_678.00 <br />004 Fill from Outslo a Zone 2-B to Portal Zone 4-C <br />I-Push 0.10- - -$107.00 -- <br />005 _ <br />-Push Fill from Zone I-C to Water Tank Bench Zone 3-C 83.04 $89,288.00 <br />006 -Push Fill from Hi wall Zone 4-D to Portal Zone 4-C 2.74 _ -$2,939.00 - <br />007 -Push Fill from East Highwall Zone 4-D to West Zone 4-D _1_93 $2,071.00 <br />_ <br />008 - -'--- ---" -------- <br /> <br />- <br />C&S Zone 1-A to Portal Zone 4-C <br />-Haul Fill from <br />121.03 <br />__ <br /> <br />- - $209,351.00 <br />-- ---- <br />_ ___ <br />009 _ <br />-Haul Fill from Storage Zone 1 -B to Road Cut Zone 2-C - - <br />- ? - 0.83 $1,035.00 -- <br />_ <br />010 _ <br />----- <br />4-C <br />-Haul Fill from Storage Zone 1-B to Portal Zone <br />--- ---- <br /> <br />! ---__ <br />- 7.71 <br /> <br />___--- <br />$13,410.00 <br />-, ----- <br />_ -- ---------- <br />--' - ---------- - <br />l Fill from ROM Area to Portal Zone 4-C <br />H , <br />25.81 <br />$44,156.00 <br />-- <br />011 <br />012 au <br />- <br />-Haul Fill from ROM Area to Diversion Zones 3-_A, 3-B and 3-C 284.28 - $484,091.00-_ <br />_ <br />013 '-Haul Fill from Storage Zone 1-B to Warehouse Zone 2-A - - 49.50- _ $37,971.00 _ <br />014 -Haul Fill from Storage Zone I-B to Coal Zone 4-B _ 31.49 - $24,152.00 <br />-' <br />015 -Haul Fill from Zone 1-E to Zone 2-D 0.34- _ <br />- - $261.00 - <br />016 _ <br />-Haul Fill from Zone 1-D to Zone 4-C <br />- - _ 3.22 _-' r_-_-$2,470.00 <br />- <br />0 <br />17 - - -- <br />-------- <br />; -Backfill Orchard Valley West Mine <br />--- - - 24.09 $25,888.00 <br />------- <br />- - -- <br />019 <br />-- <br />- <br />- -Regrade TR-38 Drill Pad <br />--- <br />__1.14 - <br />_' - $305.00- - <br /> <br />025 ---- ----- ------------ <br />-Place Four Feet of Cover Material on Waste Disposal Area <br /> <br />- <br />- <br /> <br />-r- -------- <br />6.40_- --- <br />__;_-.__ $6,877__.00 <br />00 <br />--------- <br />026 -- -?---- - <br />Remove Temporary Waste -- Pile -- to --- Waste --- <br /> <br />Area <br />Disposal <br />m <br />2.61 <br />$3,662.00 <br />_ <br />_027 _ <br />Area <br />Refuse <br />-Haul Footprint of Coal and Mine Stockpiles to 5.68 $7,012.00 <br />032 - -- -- ---- ---- - ---------- ---------------------- <br /> <br />- <br />-Compact Waste Pile <br />-- -- --------- ------ <br /> <br />- <br />92.54 <br />$12,341.00 <br />033 ---- --- _ <br />---'-Compact OVWM Road Backfll _ 25.34 _ - - $3,379.00 <br />034 -Coin act Zones 2-A, C, D and E; 3-A, B and C; 4-A, B and C 434.52 $57,946.00 - <br />038 ---I-Rip Cut Zones 1-A B, C, D and E, 2-B; 4-D- _ _ -_ <br />--- -__'---- 27.72 - - -? $23,881_00- <br />041 ---- <br />- : Rip Roads - ------ ---- -- - - 0.12- ------ $105.00 -- <br />- <br />045 to Ponds 3 and 4 <br />'-Remove Gravel on Roads <br />j--- <br />- $1,678.00 <br />____ <br />049 _ _ <br />---- ---------------------- <br />- <br />OVWM Light Access Road <br />-Regrade <br />4.38 $612.00 <br /> <br />050 - <br />--+------ ---- - <br />-Regrade Timber Storage Access Road <br />8.36 <br /> <br />... <br />$1,168.00 <br />? <br />--- <br />--- --- --- <br />052 - ------ - <br /> <br />sal Road <br />o <br />!-Regrade Old Waste Dis <br />-- - ------ --- ----- -- -- - <br /> <br /> <br />---- <br />---- <br />86 <br />._3 <br />- <br />$1,168.00 <br />-- -----$1, --.00 - <br />-- - ---- --- <br /> <br />053 -- _ <br />- <br />- - -- ---- - -- <br />- - -- - <br />West Ridge Disposal Area <br />-Regrade <br /> <br />, <br /> <br />4.18 <br /> <br />$584.00 <br />0 -- - <br />-- --- ----- <br />054 _ <br />?- -- <br />--- - <br />-Finish Grade Lower Waste Disposal Road <br />0.08 <br />$9.00 <br />- --- -- <br />055 <br />-Rip Outer 22'of Asphalt Haul Road <br />0.10 <br />$84.00 <br />--- -- <br /> <br />056 - <br />-Haul Asphalt from Haul Road to Portal Bench Zone 4- <br />1.90 <br />$3,000.0 <br />- - <br />057 <br /> <br />_ - _ _ _ _ <br />e of Haul Road <br />Rip Outslo <br /> <br />- ? <br />0.22 <br />- <br /> <br /> <br />9 <br />- - -- - -- <br />058 _ <br />Excavate Haul Road Outslo a and Place at Toe _ <br />19.49 $2,721.00 <br />-.- <br />- <br />059 -- - --- - - -- - -- -- - <br />-Regrade, TR-38 Light Use Road <br />2.62 <br />$2,-813.00 <br />- <br /> <br />063 -- - -- ---- - <br />-Finish Grade All Reclamation Zones (1-4) <br />23.78 <br />$2,763.00 <br />-- -- - -- - <br />064 - ... -- --- --- - <br />-Finish Grade Upper Waste Disposal Road <br />0.22 <br />$25.00 <br />_ ; _ <br />-- <br /> <br />065 - <br />-Finish Grade Crushing and Screening Road <br />0.08 <br />$9.00 <br />--- - - --- - --- <br />-- - <br />066 _ <br />- - - - - - -- - - - - <br />?-Finish Grade OVWM <br />2.10 <br />$244.00 <br />-- <br />? <br /> <br />-- - -- <br />068 -- ----- -- - - -- - <br />- -- <br />-Finish Grade Waste Disposal Area <br />6.15 <br />$715.00 <br />_.-- <br /> <br />069 -- <br />;-Finish Grade ROM Storage Area <br />4.61 <br />$536.00 <br />Summary Sheet Page 1 of 3