Laserfiche WebLink
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task #: 007 State : Colorado Permitrjob# : C-1981-038 <br />Date : 11/19/2007 <br />User : JRS <br />County: Delta <br />Site : Bowie No. 1 Mine <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2:3-shank ripper <br />Shift basis : 1 per day <br />Data source:- (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $97.38 NA <br />Operating cost/hour : $138.49 100 <br />Ripper op. cost/hour : $0.00 0 <br />Operator cost/hour : $32.78 NA <br />Total unit cost/hour : $268.65 Total fleet cost/hour : $1,074.59 <br />... <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 1,489 CCY factor : 1.165 volume : 1,735 LCY <br />Source of estimated volume :Map 5C-6A and 8A-2 <br />Source of estimated swell factor : CAT Handbook <br /> <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />00 f t Material consistency : 0.90 (Cat HB) <br />Average push distance . 3 ee <br />Unadjusted hourly production :--63-3 LCY/hr <br />Material consistency description <br />Compacted rill or embankment <br />Average push gradient <br />Average site altitude <br />0.00 % (pos) <br />7,300 feet <br />Material weight : 2,900 Ibs/LCY <br />Weiaht descriotion : <br />Dozing method : 1.00 (gen.) <br />Visibility: 1.00 (avg.) <br />Job efficiency : 0.83 (1 shiff/da) <br />Spoil pile : 0.80 ffind-rt) <br />Push gradient : 1.00 (Cat HB) <br />Altitude : 1.00 (Cat HB) <br />Material weight : 0.79 (Cat HB) <br />Blade type : 1.00 <br />Net correction : 0.36 <br />Abbreviation :none <br />Filename:-6038-007