Laserfiche WebLink
rvv Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2:3-shank ripper <br />Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $97.38 NA <br /> Operating cost/hour : $138.49 100 <br /> Ripper op. cost/hour : $0.00 0 <br /> Operator cost/hour : $32.78 NA <br /> Total unit cost/hour : $268.65 Total fleet cost/hour : $1,074.59 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />014 CCY factor : <br />volume : 3 1.165 volume : 3,511 LCY <br />, <br />Source of estimated volume: Map 5C-6A and 8A-2 <br />Source of estimated swell factor :CAT Handbook <br /> <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 300 feet Material consistency : 0.90 (Cat HB) <br />Unadjusted hourly production : 633.3 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility: 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shift1day) <br />Compacted rill or embankment Spoil pile : 0.80 (fnd-d) <br /> Push gradient : 1.43 (Cat HB) <br />Average push gradient : 20.00 % (neg) Altitude : 1.00 (Cat HB) <br />Average site altitude : 7,300 feet Material weight : 0.79 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />ht : <br />terial wei <br />M 900 Ibs/LCY <br />2 Net correction : 0.51 <br />g <br />a , <br />Weight description : <br />Decomposed rock - 50% Rock, 50% Earth <br />Adjusted unit production : <br />320.95 <br />LCY/hr <br /> Adjusted fleet production : 1,283.82 LCY/hr <br /> <br />JOB TIME AND COST <br />Fleet size : 4 Dozer(s) Total job time : 2.74 Hours <br />Unit cost : $0.837 /LCY Total job cost : $2,939 <br />