Laserfiche WebLink
vMV Blade type : Semi-Universal <br />Attachment no. 1 :ROPS Cab Shift basis:_ 1 per day <br />Attachment no. 2:3-shank ripper <br />Data source:_ (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $97.38 NA <br />Operating cost/hour : $138.49 100 <br />Ripper op. cost/hour : $0.00 0 <br />Operator cost/hour : $32.78 NA <br />Total unit cost/hour : $268.65 <br />lx. Total fleet cost/hour : $1,074.59 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 22, 778 CCY factor : 1.165 volume : 26,536 LCY <br />Source of estimated volume: Map 5C-6A and 8A-2 <br />Source of estimated swell factor : CAT Handbook <br /> <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> 0 75 (avg ) <br />Average push distance : 250 feet <br />Unadjusted hourly production : 754.3 LCY/hr <br />Material consistency description <br />Compacted fill or embankment <br />Average push gradient : 30.00 % (l <br />Average site altitude : 7,370 feet <br />Material weight : 2,900 Ibs/LCY <br />Weight description : <br />Decomposed rock - 50% Rock, 50% Earth <br />JOB TIME AND COST <br />Operator skill . <br />Material consistency : <br />0.90 <br />(Cat HB) <br />Dozing method : 1.00 (gen.) <br />Visibility: 1.00 (avg.) <br />Job efficiency : 0.83 (1shift1da) <br />Spoil pile : 0.80 (fnd-rf) <br />Push gradient : 0.30 (Cat HB) <br />Altitude : 1.00 (Cat HB) <br />Material weight : 0.79 (Cat HB) <br />Blade type : 1.00 (S/SU/U) <br />Net correction : 0.11 <br />Adjusted unit production : 79.89 LCY/hr <br />Adjusted fleet production : 319.58 LCY/hr <br />Fleet size : 4 Dozer(s) Total job time : 83.04 Hours <br />Unit cost :--i3.362 /LCY Total job cost : $89,228