Laserfiche WebLink
<br />f•, <br />4 <br />Bowie No. 1 Mine C-81-038 Partial Phase i Bond Release SL-03 <br />r r- TO e <br />Task: 000 site: Bowie No. 1 Mine :Date: 21 Nov vi ?x=• 4? <br />+Delta <br />Permit Action: <br />Partial phase I Bond Release SL-03 <br />County <br />C-1981-038 <br />Descri lion- Cost S File Name: <br /> H Direct C <br />.p ecl ma o Task Descrl o ou <br /> 59 <br />3 00 <br />$502 <br />074 -Recut Haul Road Ditches . . <br />00 <br />$868 <br />075 -Construct 2730' of 3' Ditches 6.21 <br />96 <br />35 . <br />$5,021.00 <br />076 -Construct 4340' of IT Ditches . <br />97 <br />0 037 <br />00 <br />$1 <br />078 -Backfill OVM Pipeline Removal Trench . . <br />, <br />00 <br />$239 <br />079 -Establish Irri Lion Ditch at Stoma a and Loadout 1.71 <br />04 <br />4 . <br />00 <br />838 <br />$15 <br />081 -Riprap Placement . . <br />, <br /> <br /> 05 <br />3 $632 <br />00 <br />085 -Backfill and Regra de Pond 1 . <br />47 <br />2 . <br />$514.00 <br />086 -Backfill and Regrade Pond 2 . <br />52 <br />2 $524 <br />00 <br />087 -Backfdl and Re de Pond 3 . <br />91 <br />2 . <br />00 <br />$605 <br />088 -Backfill and Regrade Pond 4 . <br />77 <br />10 . <br />00 <br />503 <br />$1 <br />089 -Remove Concrete Pond Dams . <br />31 <br />2 , <br />. <br />00 <br />$479 <br />091 -Backfill and Re Waste Pile Pond . <br />2 <br />83 . <br />$586.00 <br />092 -Backfill and Regrade Timber Storage Pond . <br />1 <br />00 00 <br />$208 <br />093 -Backfill and Regrade Coal Stockpile Pond . <br />2 <br />88 . <br />$597 <br />00 <br />095 -Backf ll and Re Pond W- 1 . <br />88 <br />2 . <br />00 <br />$597 <br />096 -BackEll and Regrade Pond W-2 . . <br /> <br />100 -Replace Tops oil from Stockpile to Waste Disposal Area 4.89 <br />75 <br />25 $5,256.00 <br />674.00 <br />$27 <br />101 -Move Fill Topsoil Pile into Stockpiled Area . <br />47 <br />66 , <br />211.00 <br />$51 <br />102 -R lace Tops I ifrom Stockpile to OVWM . <br />49 <br />11 , <br />349.00 <br />$12 <br />103 -Replace T soil from Stockpile to Replaced Fill . <br />84 <br />2 , <br />055.00 <br />$3 <br />104 ! - lace Topsoil from Stockpile to OV WM Vent Shaft Access . <br />94 <br />5 , <br />167.00 <br />$10 <br />105 -Haul Stevens Gulch Topsoil to OVM . <br />44 <br />0 , <br />$478.00 <br />106 -Redistribute Topsoil at Truck Dump Station <br />soil from Stoc ile to OVM Main Diversion Ditch <br />lace To <br />R . <br />0.44 $550.00 <br />107 <br />108 p <br />ep <br />- <br />-Replace Topsoil from Stoc ile to Remaining Mine Site 12.71 $20,008.00 <br />109 -R lace Topsoil from OVWM Slide Area 0.30 $324.00 <br />110 -Replace Topsoil from Stockpile to TR-38 Drill Pad 0.09 $95.00 <br />111 -Replace To soil from Stockpile to TR-38 Light Use Road 0.81 $874.00 <br />112 -Replace Topsoil from Stockpile to Pond W- 1 1.55 I $321.00 <br />113 -Replace Topsoil from Stockpile to Pond W-2 1 $321.00 <br /> <br /> <br /> <br />18 <br /> <br />- <br />-- <br />-Seal OWM and OVWM Vent Shafts - <br />-- - - - <br /> <br /> <br />--- 120.00 --------- ---- - <br /> <br /> <br />$59,057.00 <br />---- <br />- - <br />125 --r ------ .. <br />r-Pluiand Seal All Boreho es 105.00 $35,559.00 <br />130 Revejetrie OVM 20.00 $33,701.00 <br />131 -Revelebw OVWM 24.44 $41,182.00 <br />132 -Revejetate Remainder of Mine Site 82.28 $58,870_.00 <br />133 -Rove elate Narrowed Haul Road Outslope 6.76 $11,391.00 <br /> r--- - <br />-Demolish and Remove All Structures 400.00 <br />--- --- r - - $293,402.00 <br />--?---- -- <br /> <br />--_.._ -- ---- -- <br />146 .-- , - <br />Egnipment for Initial Reclamation <br />-Mobil obilizelDemobilize 12.29 I $44,266.00 <br />__---- <br />147 _ <br />bilizelDemobilize Equipment for Pond Cleaning <br />!-Mo 6.00 $2,422.00 <br />149 _ <br />-MobilizelDemobilize Equipment for Pond Removal 6.00 $3,026.00 <br />149 -MobilizelDemobilize Equipment for Site Maintenance 24.00 $43,001.00 <br />Summary Sheet Page 2 of 3