Laserfiche WebLink
? N <br />/, s. <br />c <br />Bowie No. 1 Mine C-81-038 Partial Phase I Bond Release SL-03 <br />Tom; 000 i Site: Bowie No. 1 Mine Date: 21 Nov 07 User. JRS <br />Pemut Action: <br />Deacri tip: Partial Phase I Bond Release SL-03 County <br />Cost Summary File Name: Delta <br />C-1981-038 <br /> <br />T as R amation Task Descri tlo Rem _Dirett Cost <br /> <br />001 -Push Fill from Zone 1-A to Zone 4-A at C&S Bench 197.83 $212,587.00 <br />002 -Push Fill from Substation Zone 1-D to Road Cut Zone 2-D 0.35 $377.00 <br />003 -Push Fill from Substation Zone 1-D to Road Cut Zone 2-E 0.63 $678.00 <br />004 -Push Fill from Outslo Zone 2-B to Portal Zone 4-C 0.10 $107.00 <br />005 -Push Fill from Zone I-C to Water Tank Bench Zone 3-C 83.04 $89,288.00 <br />006 ' -Push Fill from Hi wall Zone 4-1) to Portal Zone 4-C 2.74 $2,939.00 <br />007 i -Push Fill from East H' wall Zone 4-D to West Zone 4-D 1.93 $2,071.00 <br />008 -Haul Fill from C&S Zone 1-A to Portal Zone 4-C 121.03 $209,351.00 <br />009 -Haul Fill from Storage Zone 1-B to Road Cut Zone 2-C 0.83 $1,035.00 <br />010 -Haul Fill from Storage Zone 1-B to Portal Zone 4-C 7.71 $13,410.00 <br />Oil -Haul Fill from ROM Area to Portal Zone 4-C 25.81 $44,156.00 <br />012 -Haul Fill from ROM Area to Diversion Zones 3-A, 3-B and 3-C 1 284.28 $484,091.00 <br />013 -Haul Fill from Storage Zone 1-B to Warehouse Zone 2-A 49.50 $37,971.00 <br />014 <br />1 -Haul Fill from Storage Zone 1-B to Coal Zone 4-B 31.49 $24,152.00 <br />015 -Haul Fill from Zone 1-E to Zone 2-D 0.34 $261.00 <br />016 -Haul Fill from Zone 1-D to Zone 4-C 3.22 $2,470.00 <br />017 -Backfill Orchard Valle West Mine 24.09 $25,888.00 <br />019 -Re TR-38 Drill Pad 1.14 $305.00 <br /> <br />025 -Place Four Feet of Cover Material on Waste Disposal Area 6.40 $6,877.00 <br />026 -Remove Temporary Waste Pile to Waste Disposal Area 2.61 $3,662.00 <br />027 -Haul Footprint of Coal and Mine Stockpiles to Refuse Area 5.68 $7,012.00 <br /> <br />032 -Compact Waste Pile 92.54 $12,341.00 <br />033 -Co OVWM Road Backfill 25.34 $3,379.00 <br />034 -Compact Zones 2-A, C, D and E; 3-A, B and C; 4-A, B and C 434.52 $57,946.00 <br /> <br />038 -Rip Cut Zones 1-A, B, C, D and E, 2-B; 4-D 27.72 $23,881.00 <br />041 ! _Rip Roads 0.12 $105.00 <br /> <br />045 - Remove Gravel on Roads to Ponds 3 and 4 2.19 $1,678.00 <br />049 - Regrade OVWM Light Access Road 4.38 <br />----? <br />----- _ $612.00 <br />nen ---1 n_. 3_ T:_1._ C&___ A....eea D-A <br />214 e1 1Fi_ nn <br />052 -Regrade Old Waste Disposal Road 8.36 $1,168.00 <br />053 -R West Ridge Disposadl Area 4.18 $584.00 <br />054 -Finish Grade Lower Waste Disposal Road 0.08 $9.00 <br />055 Rip Outer 2Tof Asphalt Hwl Road 0.10 $84.00 <br />056 Haul Asphalt Emm Had Road to Portal Bench Zone 4-C 1.90 $3,000.00 <br />057 -Rip Outslope of Haul Road 0.22 $193.00 <br />058 -Excavate Haul Road Outslope and Place at Toe 19.49 $2,721.00 <br />059 Light Use Road <br />_Re?radS, T!ta 2.62 $2,813.00 <br /> _ <br />063 -Finish Grade All Reclamation Zones 1-4 23.78 $2,763.00 <br />064 ;-Finish Grade Upper Waste Disposal Road 0.22 $25.00 <br />065 -Finish Grade Crushing and Screening Road 0.08 $9.00 <br />066 -Finish Grade OVWM 2.10 $244.00 <br />068 -Finish Grade Waste Disposal Area 6.15 $715.00 <br />)69 -Finish Grade ROM Storage Area 4.61 5536.00 <br />Summary Sheet Page 1 of 3