Laserfiche WebLink
d <br />Bowie No. 1 Mine C-81-038 Partial Phase I Bond Release SL-03 <br />Task: 000 (Site: Bowie No. 1 mum ---- -- - - -- <br />Delta <br />Count <br />Permit Action _ <br />ton; Partial Phase I Bond Release SL-03 <br />Cost Summary y <br />File Name: C-1981-038 <br /> <br />.I. Recl ma on Task ri do Hours Dircet Cost <br />153 -Proctor Testing Backfilled Material 20.00 <br />00 <br />40 $702.00 <br />$25,302.00 <br />154 <br />155 <br />158 ?-Nuclear Density Testing Backfill <br />-Water Truck for Backfill Moisture Augmentation <br />i-Yearly Site Maintenance and Pond Cleaning . <br />450.00 <br />i 240.00 $40,751.00 <br />$370,550.00 <br /> <br />201 Seal Loadout Wells <br />202 Demolish and Remove Structures at Loadout <br />Task 203 Combined with Task 202 During SL-03 and RN-05 <br />204 Haul Foo riots of Loadout Stoc ilea to Refuse Area <br />205 Coal Store e/Loadout Area <br />206 Excavation/Gmding at Storage Area and Loadout <br />207 Grade Railroad S <br />208 Finish Grade Railroad Spur <br />209 Replace Topsoil from Stockpile to Truck pump Station <br />210 Reseed Train Loadout and Coal Stoc ile Areas <br />211 Remove Coal Stockpile Pond <br />212 Remove Train Loadout Pond 12.00 <br />175.00 <br /> <br />4.60 <br />0.44 <br />34.33 <br />50.42 <br />19.52 i <br />0.59 <br />80.00 <br />1.00 <br />8.74 $3,545.00 <br />$703,538.00 <br /> <br />$7,814.00 <br />$381.00 <br />$36,889.00 <br />$54,182.00 <br />$2,268.00 <br />$639.00 <br />$41,033.00 <br />$208.00 <br />$1,814.00 <br /> <br /> <br /> 588.00 <br />362 <br />$3 <br /> Total Indirect Costs , <br />, <br /> <br /> 120.11 <br />$52 <br /> Liability Insurance (1.55% , <br />307.17 <br />$35 <br /> Performance Bond 1.05% , <br />258.80 <br />$336 <br /> Profit 10'/0 78 <br />665 <br />3 , <br />500.00 <br />$49 <br /> Job S tendant (1,200 hours $41.25-- . <br />, , <br /> <br /> 774.09 <br />835 <br />$3 <br /> Total Contract , <br />, <br /> <br /> 020.40 <br />$163 <br /> Engineering Fees (4.25% , <br />66 <br />662 <br />$124 <br /> Administrative Costs (3.25%) I . <br />, <br /> ? <br /> <br /> <br /> 14 <br />457 <br />123 <br />$4 <br /> Tnt't Ushility . <br />, <br />, <br /> <br />NOTE: Based on the statutory requirements of Rule 3, the Division ---- <br />--- _ ----- --fi---- - <br />is required to retain an additional $501,479.00 in bond monies. <br />-- <br />This is based on the requirement that only 60% o - the <br />applicable amount may be released for a Phase I Bond Release.'. <br />TOTAL BOND HELD BY THE DIVISION (Pursuant to Rule 3) $4,624,936.00