Laserfiche WebLink
CIRCGS cost 'Estin atinc) Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION! <br />Task # 01a State :Colorado Perm it/job# M-2008-070 <br />Date : _0111312009 County :Rio Blanco Abbreviation :none <br />User : GRM Site :Wrc Gravel Pit _ Filename :M070-01a <br />Blade type :Universal, <br />Attachment no. 1 :ROPS Cab Shift basis per day <br />Attachment no. 2 :3-shank ripper <br />Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $57.40 NA <br />Operating cost/hour : $77.43 100 <br />Ripper op. cost/hour : $1.68 25 <br />Operator cost/hour : $32.78 NA <br />Total unit cost/hour : $169.28 Total fleet cost/hour : $169.28 <br /> <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 43,700 LCY factor : NA volume : 43,700 LCY <br />Source of estimated volume :linear feet of slopes, 2:1 - 3:1 volumes <br />Source of estimated swell factor :NA -:. <br />;. .. .:. <br />HOURLY PRODUCTION <br />Job Condition Correction Factors <br />Source <br /> •II 0 75 (ava.) <br />Average push distance : 50 feet <br />Unadjusted hourly production : 1,627.0 LCY/hr <br />Material consistency description <br />Partly consolidated stockpile <br />Average push gradient : 29.70 % (r <br />Average site altitude : 5,875 feet <br />Material weight : 2,650 Ibs/LCY <br />Weight description : <br />Decomposed rock - 25% Rock, 75% Earth <br />JOB TIME AND COST <br />Operator ski . <br />Material consistency : 1.10 <br />Dozing method : 1.00 <br />Visibility: 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.80 <br />Push gradient : 1.60 <br />Altitude : 1.00 <br />Material weight : 0.87 <br />Blade type : 1.00 <br />Net correction : 0.76 <br /> <br />(Cat <br />(Cat HB) <br />(S/SU/U) <br />Adjusted unit production : 1234.47 LCY/hr <br />Adjusted fleet production : 1,234.47 LCY/hr <br />Fleet size Dozers) Total job time : 35.40 Hours <br />$5 <br />Unit cost : $0.137 /LCY Total job cost : ,993