My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-01-13_PERMIT FILE - M2008070 (3)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2008070
>
2009-01-13_PERMIT FILE - M2008070 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:39:53 PM
Creation date
1/16/2009 8:05:46 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008070
IBM Index Class Name
PERMIT FILE
Doc Date
1/13/2009
Doc Name
Final reclamation liability estimate
From
DRMS
To
JSC, Inc.
Email Name
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Coat Estimating Software <br />BULLDOZER RIPPING WORK <br />PROJECT IDENTIFICATION, <br />Task 02a State :Colorado Permit/job #:M-2008-070 <br />------ ------ - - - - - <br />-- - - -- - -- Date:----- 01/13/2009 County: Rio Blanco Abbreviation :none <br />-- -- - - - --- --- -------------- - ----- <br />User : GRM Site :Wrc Gravel Filename :M070-02a_ - <br />Blade type :Universal <br />Attachment no. 1 :ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $57.69 NA <br />Dozer operating cost/hour : $77.43 100 <br />Ripper operating cost/hour : $6.86 100 <br />Operator cost/hour : $32.78 NA <br />Total unit cost/hour : $174.75 Total fleet cost/hour : $174.75 <br />MATERIAL QUANTITIES <br /> Selected estimating method : Area <br />Alternate methods - <br />Seismic : NA NA Load factor : NA Bank volume : NA BCY <br />Area : 14.00 acres Rip depth (ft) : 2.00 Volume : 45,173 BCY or CCY <br />Source of estimated quantity :standard reclamation <br />Source of estimated load factor : NA 77 <br />:.;:.::.:: .::.:.:..:..:.::. <br />HOURLY PRODUCTION <br />Alternate methods - Job Condition Correction Factors - <br />Seismic : Seismic velocity : NA feet/second Unadjusted production <br />Unadjusted production : NA cu. yds./hour per selected method : 2,414.88 cu. yds./hour <br />Area : Avg. ripping depth : 2.00 feet/pass Site altitude : 5,875 feet <br />Average ripping width : 7.08 feet/pass Altitude adjustment : 1.00 (Cat HB) <br />Average ripping length : 150.00 feet/pass Job efficiency factor : 0.83 (1 shift/day) <br />Average dozer speed : 88.00 feet/minute Net job correction : -0. 83 multiplier <br />Average maneuver time : 0.25 minutes/pass <br />Production per unit area :---6.748 acres/hour <br />Adjusted unit production : <br />2,004.35 <br />cu. yds./hour <br />Unadjusted production : 2,414.88 cu. yds./hour Adjusted fleet production : 2,004.35 cu. yds./hour <br />JOB TIME AND COST <br />Fleet size : 1 dozers) Total job time : 22.54 hours <br />Unit cost : $0.087 per cu. yd. Total job cost : $3,938
The URL can be used to link to this page
Your browser does not support the video tag.