My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-05-15_GENERAL DOCUMENTS - M1980244
DRMS
>
Day Forward
>
General Documents
>
Minerals
>
M1980244
>
2007-05-15_GENERAL DOCUMENTS - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:16:53 PM
Creation date
1/2/2009 3:37:36 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
5/15/2007
Doc Name
Proposed Uncertified Liner Isolation Barrier- AM#8
From
Golder Associates Inc.
To
CC&V
Permit Index Doc Type
Gen. Correspondence
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The CQA Monitor shall keep daily records consisting of field notes, observation and testing data <br />sheets, summary of the daily meeting with the INSTALLER or CONTRACTOR, and reporting of <br />construction problems and resolutions. This information shall be submitted on a regular basis to the <br />MANAGER for review. <br />7.02 GEOSYNTHETIC OBSERVATION AND TESTING FORMS: <br />The CQA Monitor shall document geosynthetic observations and test results on forms which include <br />the following information: <br />• date, project name, location, and weather data; <br />• identification of panel or seam numbers; <br />• description of ongoing construction, detailing deployment areas; <br />• numbering system identifying test or sample number; <br />• location and identification of repairs and date of repair; <br />• length and/or thickness measurements for geomembrane panels or seams; <br />• welding machine temperatures and settings; <br />• welding machine and technician identifications; <br />• location of tests and test results; <br />• identification of testing technicians and time of tests; and <br />• signature or initials of the CQA Monitor. <br />7.03 PHOTO DOCUMENTATION: <br />The CQA Monitor shall photograph all phases of construction. <br />7.04 DESIGN AND SPECIFICATION CHANGES: <br />During construction, the need to address design and SPECIFICATION changes, modifications, or <br />clarifications may arise. In such cases the CQA Monitor shall notify the MANAGER, which will <br />notify the DESIGN ENGINEER and CERTIFYING ENGINEER. Design and SPECIFICATION <br />changes shall only be made with written agreement from the MANAGER and DESIGN <br />ENGINEER. <br />7.05 WEEKLY PROGRESS REPORTS: <br />The CQA Monitor shall prepare weekly progress reports summarizing all construction and CQA <br />activities. This report shall be submitted to the MANAGER and shall include the following <br />information: <br />• . date, project name, and location; <br />• summary of construction related activities; <br />• summary of geomembrane deployed (per day); <br />Section 01400.2 Page 9 of 10 March 22, 2000 <br />Geosynthetic CQA Plan Golder Associates Revision 5 <br />1.W 2-0100\LINERISOLATOJNB -I5A YOT W2CQA 6 SYNI}IE1lCS-
The URL can be used to link to this page
Your browser does not support the video tag.