Laserfiche WebLink
• summary of samples taken and test results; <br />• summary of geomembrane areas completed, and approved for Drain Cover Fill <br />placement; <br />• summary of deficiencies and/or defects and resolutions; and <br />• signature of the CQA Monitor. <br />7.06 CONSTRUCTION CERTIFICATION REPORT: <br />At the completion of the project, the CQA Monitor shall submit to the MANAGER a Construction <br />Certification Report. This report shall certify that the work has been performed in compliance with the <br />design DRAWINGS and project SPECIFICATIONS and will contain the following information: <br />• summary of all construction activities; <br />• observation and test data sheets; <br />• photographic documentation; <br />• CQA staff scheduling; <br />• copies of weekly reports; <br />• CONTRACTOR'S subgrade acceptance forms; <br />• temperature monitoring results; <br />• geosynthetic quality control documents; <br />• geosynthetic quality assurance documents; <br />• geomembrane installation observations, such as for deployment, trial seams, defect <br />repair, destruct testing and non-destructive testing; <br />• sampling, testing locations, and test results; <br />• changes to the design DRAWINGS or project SPECIFICATIONS and the justification <br />for these changes; <br />• record DRAWINGS; and <br />• a certification statement that construction was completed in compliance with the <br />DRAWINGS and SPECIFICATIONS, signed, and sealed by the CERTIFYING <br />ENGINEER registered in the State of Colorado. <br />* * * END OF SECTION * * * <br />Section 01400.2 Page 10 of 10 March 22, 2000 <br />Geosynthetic CQA Plan Golder Associates Revision 5 <br />1. ? lQw?oov.uu?usouno?usnan-i5 + YO W 20Qa ceosvx WS.n