Laserfiche WebLink
Repairs - The CQA Monitor shall observe and document that all repair materials, techniques, and <br />procedures used for repairs are approved in advance and meet the requirements of the project <br />SPECIFICATIONS. The CQA Monitor shall verify that all defects and repairs are marked, recorded, <br />repaired, tested, and wrinkles are addressed, prior to being covered by other materials; and that repairs <br />are performed as specified, including proper patch size or dimension. The CQA Monitor shall record <br />defects and repairs on the defect and repair log forms. <br />6.03.02 GEOTEXTILE: <br />During geotextile installation, the CQA Monitor shall observe and document deployment, field <br />seaming, and repairs to assure that the installation is in compliance with the SPECIFICATIONS. <br />Deployment - The CQA Monitor shall verify that the subgrade is free of deleterious materials <br />prior to deployment, anchoring is achieved as specified, specified methods are used to <br />minimize wrinkles and protect underlying layers during cutting of materials, and deployment <br />procedures are performed in compliance with the project SPECIFICATIONS. <br />Seams - The CQA Monitor shall verify sufficient overlap and that the specified seam <br />procedures were followed in compliance with the project SPECIFICATIONS <br />Repairs - The CQA Monitor shall verify that all repairs are performed in compliance with <br />SPECIFICATIONS. <br />Protection - The CQA Monitor shall observe and document that all soil materials placed on <br />top of the geosynthetics are done in such a manner as to ensure that the geosynthetics and <br />underlying materials are not damaged. <br />6.03.03 POLYETHYLENE PIPE AND FITTINGS: <br />During polyethylene pipe installation, the CQA Monitor shall observe and document that the <br />installation is in compliance with the project SPECIFICATIONS. CQA monitoring of the <br />polyethylene pipe and fittings will include the following: <br />Placement - Observation that the handling procedures used do not damage the pipe, backfill is <br />placed in compliance with the requirements of the project SPECIFICATIONS so as not to <br />damage the pipe, any foreign material is removed from the interior of the pipe and <br />indentations on the pipe are within the MANUFACTURER's allowable limits. <br />Joints and Connections - Monitoring of the jointing and connection operations to verify that <br />the CONTRACTOR follows the SPECIFICATIONS and the pipe MANUFACTURER's <br />recommendations, verification that the pipes are clean when installed, that perforated sections <br />of pipe are aligned properly prior to connection, pipe boot connections are made in the field <br />using the specified rings and clamps, and plastic ties are used to connect the secondary <br />perforated pipes to primary perforated pipes. <br />Nondestructive Testing - Observe any required testing of the pipe to verify compliance with <br />the project SPECIFICATIONS. <br />PART 7.0 DOCUMENTATION <br />Documentation kept by the CQA Monitor shall consist of daily record-keeping, documentation of <br />construction problem resolutions, documentation of design and SPECIFICATION changes, <br />photographic records, weekly progress reports, chain of custody forms for test sample tracking, and a <br />Construction Certification Report. <br />7.01 DAILY RECORD KEEPING: <br />Section 01400.2 Page 8 of 10 March 22, 2000 <br />Geosynthetic CQA Plan Golder Associates Revision 5 <br />Morz?aow?oov.wea?sounoNenax-uFUVOnwrr xQA ceosvx MS.?