My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-05-15_GENERAL DOCUMENTS - M1980244
DRMS
>
Day Forward
>
General Documents
>
Minerals
>
M1980244
>
2007-05-15_GENERAL DOCUMENTS - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:16:53 PM
Creation date
1/2/2009 3:37:36 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
5/15/2007
Doc Name
Proposed Uncertified Liner Isolation Barrier- AM#8
From
Golder Associates Inc.
To
CC&V
Permit Index Doc Type
Gen. Correspondence
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Trial Seams - The CQA Monitor shall verify that seaming conditions are performed in <br />compliance with SPECIFICATIONS, tests are performed at required intervals, specified test <br />procedures are followed, and retests are performed in compliance with the <br />SPECIFICATIONS. If the ambient air temperature measured by the CQA Monitor is above <br />35°F for the entire day, the INSTALLER shall perform trial seams at the beginning of each <br />crew shift, and immediately following any work stoppage (i.e., for lunch, weather conditions, <br />etc.) of 30 minutes or more for each seaming apparatus used that day. If the ambient air <br />temperature measured by the CQA Monitor is below 35°F for the entire day, the <br />INSTALLER shall perform four (4) trial seams, at approximately the same time interval <br />throughout the scheduled work day. Each Seamer shall make at least one trial seam each day. <br />Seaming operation shall not commence until the CQA Monitor has determined that the <br />seaming process is meeting the SPECIFICATION requirement and is acceptable. The CQA <br />Monitor shall record the trial weld results on the trial seam log form. <br />Field Seamine - The CQA Monitor shall verify that only approved equipment and personnel <br />perform welding, all welding is performed under suitable conditions as specified in the <br />project SPECIFICATIONS, specified overlaps are achieved, seams are oriented in <br />compliance to project requirements, and that grinding techniques and extrudate meet project <br />requirements for extrusion welding. The CQA Monitor shall record all field seaming on field <br />seaming log forms. <br />Non-Destructive Seam Continuity Testing - The CQA Monitor shall verify that all seams and <br />repair are non-destructively tested in compliance with the project SPECIFICATIONS. If a <br />seam cannot be tested, the CQA Monitor shall observe cap strip operations. The CQA <br />Monitor shall verify that test equipment and gauges are functioning properly and that test <br />procedures are in compliance with the project SPECIFICATIONS. The CQA Monitor shall <br />verify that all seams and repairs with failing test results are repaired and/or re-tested until <br />passing results are achieved. The CQA Monitor shall record all non-destructive test locations <br />on the vacuum test and pressure test log forms. <br />Destructive Seam Testine - The INSTALLER shall obtain samples, at locations selected by <br />the CQA Monitor, of the field seamed geomembrane approximately 24 inches along and 12 <br />inches across the seam and centered over the seam as follows: <br />• a minimum of one sample per day; <br />• a minimum of one sample for each geomembrane seamer; <br />• a minimum of one sample every 500 feet of seaming; and <br />• seams that appear suspect to the CQA Monitor. <br />The CQA Monitor shall witness the testing of destructive seam samples by the INSTALLER. The <br />INSTALLER shall mark all samples with their roll and seam number, date, machine number, welding <br />technician identification, extruder and nozzle/wedge temperature, and ambient air temperature. <br />The INSTALLER shall test all destructive samples in compliance with the project <br />SPECIFICATIONS. <br />The INSTALLER shall be responsible for patching all areas cut for test samples in accordance with <br />the SPECIFICATIONS and MANUFACTURER's requirements and performing non-destructive <br />testing (i.e., vacuum box) of the seams. The CQA Monitor shall record test locations on the <br />geomembrane defect log forms. Additional testing information will be recorded on the geomembrane <br />seam destructive sample log form. The CQA Monitor shall track failing tests as described in the <br />SPECIFICATIONS. <br />Section 01400.2 Page 7 of 10 March 22, 2000 <br />Geosynthetic CQA Plan Golder Associates Revision 5 <br />-%1 COW 1004,PIERISOWTIONBARR-1 SF YOT n2CQA -SY TICSD
The URL can be used to link to this page
Your browser does not support the video tag.