My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-05-15_GENERAL DOCUMENTS - M1980244
DRMS
>
Day Forward
>
General Documents
>
Minerals
>
M1980244
>
2007-05-15_GENERAL DOCUMENTS - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:16:53 PM
Creation date
1/2/2009 3:37:36 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
5/15/2007
Doc Name
Proposed Uncertified Liner Isolation Barrier- AM#8
From
Golder Associates Inc.
To
CC&V
Permit Index Doc Type
Gen. Correspondence
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6.03 CONSTRUCTION MONITORING AND TESTING: <br />The CQA Monitor shall monitor and test all geosynthetic components of the construction to verify that <br />the construction is in compliance with the project SPECIFICATIONS. The CQA Monitor shall <br />identify inadequate construction methodologies or materials which may adversely impact the <br />performance of the facility being constructed and existing structures. Visual observations throughout <br />the construction process shall be made to ensure that the materials are placed to the lines and grades as <br />shown on the DRAWINGS. <br />The CQA monitor shall review the following submittals by INSTALLER during the project: <br />• verification that a qualified land surveyor has verified all lines and grades; and <br />• subgrade surface acceptance certificates for each area to be covered by the lining system, <br />signed by the INSTALLER. <br />The CQA Monitor shall: <br />• Inspect all geosynthetic materials delivered to site. The CQA Monitor shall document <br />any damage and notify MANAGER; <br />• obtain geosynthetic packaging identification slips for verification and generation of an <br />on-site materials inventory; <br />• observe subgrade conditions prior to geosynthetics installation and verify that any <br />deficiencies, as defined in Section 02200 of the SPECIFICATIONS, are corrected; <br />• observe permanent anchoring of geosynthetics to verify that design and project <br />SPECIFICATIONS are met; <br />• observe that required overlap distances are met; <br />• monitor and record ambient air temperatures; <br />• verify that no continuous horizontal seams are placed on slopes unless approved by <br />CERTIFYING ENGINEER; and, <br />• observe and document that all soil materials placed on top of the geosynthetics are done <br />in such a manner as to ensure that the geosynthetics are not damaged. <br />6.03.01 GEOMEMBRANE: <br />During geomembrane installation, the CQA Monitor shall observe and document deployment, trial <br />seams, field seaming, non-destructive and destructive seam testing, and repairs to assure that the <br />installation is in compliance with the SPECIFICATIONS. <br />Deployment - The CQA Monitor shall verify that only approved materials are used, each <br />panel is given a unique panel number, no geomembrane is placed during unsuitable weather <br />conditions as outlined in Section 02776, Article 1.05 of the SPECIFICATIONS, the <br />geomembrane is not damaged during installation, and anchoring is performed in compliance <br />with the SPECIFICATIONS and design DRAWINGS. The CQA Monitor shall record the <br />deployment on the deployment log form. <br />Section 01400.2 Page 6 of 10 March 22, 2000 <br />Geosynthetic CQA Plan Golder Associates Revision 5 <br />1:\072140\0100VRJFRISOLATI0NBA2R-15M YOM 2CQA GFASYMI'HEE'1'ICS.pOC
The URL can be used to link to this page
Your browser does not support the video tag.