Laserfiche WebLink
• review all the previous day's accomplishments and activities; <br />• review scheduled work location and activities for the day; and, <br />• discuss any problems or potential construction problems. <br />• This meeting will be documented by the CQA Monitor. <br />5.03 DEFICIENCY MEETINGS: <br />Special meetings will be held, as needed, to discuss potential problems or deficiencies. At a minimum, <br />these meetings will be attended by the CQA Monitor and INSTALLER or CONTRACTOR. If the <br />problem relates to a design issue, the MANAGER, DESIGN ENGINEER and CERTIFYING <br />ENGINEER should also be present. The meeting will be documented by the CQA Monitor. <br />PART 6.0 GEOSYNTHETICS CONSTRUCTION QUALITY ASSURANCE <br />Construction of the valley leach facility or specified geosynthetics must be in compliance with the <br />design plans and SPECIFICATIONS. CC&V shall implement a CQA monitoring and testing program <br />to ensure construction compliance by the CONTRACTOR. The quality assurance program shall <br />consist of reviewing CONTRACTOR quality control submittals, material conformance testing, <br />construction monitoring and testing. <br />The types of geosynthetics used in the valley leach facility construction include polyethylene pipe, <br />geomembrane and geotextile. These geosynthetics are defined in the project SPECIFICATIONS. <br />Prior to and during construction, these geosynthetics shall be sampled and tested to determine if they <br />meet project SPECIFICATIONS. All tests shall be performed in a geosynthetics laboratory approved <br />by the MANAGER. <br />6.01 REVIEW QUALITY CONTROL SUBMITTALS: <br />Prior to geosynthetic installation, the CQA Monitor shall review the INSTALLER'S quality control <br />submittals to evaluate or confirm that these materials meet project requirements. The CQA Monitor <br />shall review the QC submittals that are outlined in Section 2776 (Geomembrane) and Section 02777 <br />(Geotextile) of the SPECIFICATIONS. <br />6.02 GEOMEMBRANE CONFORMANCE TESTING: <br />Prior to geosynthetic installation, the CQA Monitor shall obtain samples of the geomembrane for <br />conformance testing to confirm that these materials meet project requirements. The conformance <br />testing frequency shall be at a rate of 1 test per 150,000 square feet. Samples shall be taken across the <br />entire width of the roll and shall not include the first 3 feet. The samples shall be 3 feet wide by the <br />roll width. The CQA Monitor shall mark the machine direction, roll number on the sample, and date <br />the sample was obtained and forward the sample to a third party geosynthetic laboratory. As a <br />minimum, the following conformance tests shall be conducted; with project requirements outlined in <br />Section 02776, Article 2.01: <br />• Geomembrane: density (ASTM D1505) <br />carbon black content (ASTM D1603) <br />thickness (GRI-GM8) <br />tensile strength (ASTM D638) <br />All conformance tests shall be performed in compliance with the project SPECIFICATIONS. The <br />CQA Monitor shall review the test results and shall report any nonconformance to the MANAGER, <br />CERTIFYING ENGINEER and the Geosynthetics Installation CONTRACTOR. <br />Section 01400.2 Page 5 of 10 March 22, 2000 <br />Geosynthetic CQA Plan Golder Associates Revision 5 <br />I:WT21dOW100LL.WERISOIATTONBARR-IlMAYOM'IT 20QA_GFASYMHETTCS.DOC