My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-05-15_GENERAL DOCUMENTS - M1980244
DRMS
>
Day Forward
>
General Documents
>
Minerals
>
M1980244
>
2007-05-15_GENERAL DOCUMENTS - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:16:53 PM
Creation date
1/2/2009 3:37:36 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
5/15/2007
Doc Name
Proposed Uncertified Liner Isolation Barrier- AM#8
From
Golder Associates Inc.
To
CC&V
Permit Index Doc Type
Gen. Correspondence
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• monitor and document geosynthetic material placement, trial seam testing, non- <br />destructive testing, seaming and repair operations, and destructive testing; <br />• identify seam samples for CQA destructive testing; <br />• assure that testing equipment used, and tests performed are conducted according to <br />project SPECIFICATIONS and industry standards; <br />• perform or observe, document, and report test results to MANAGER as required; <br />• report any deficiencies to MANAGER that are not corrected to the satisfaction of the <br />CQA Monitor, including design or project SPECIFICATION changes; and <br />• prepare a Construction Certification Report describing the construction, any deviations <br />from SPECIFICATIONS or, DRAWINGS and details, details of all field and laboratory <br />details, subgrade acceptance forms, test data, tests results (both laboratory and field), QC <br />submittals, geomembrane panel layout as-built prepared by the CQA Monitor, <br />professional certification that construction was completed in compliance with the <br />DRAWINGS and SPECIFICATIONS. The report will be signed and sealed by the <br />CERTIFYING ENGINEER registered in the State of Colorado. <br />2.06 GEOSYNTHETICS MANUFACTURER: <br />The Geosynthetics Manufacturer, also referred to as the "MANUFACTURER", is responsible for <br />production of the geosynthetic components outlined in this plan. Each MANUFACTURER must <br />verify prior to construction that the MANUFACTURER can produce material that meets the <br />requirements outlined in project SPECIFICATIONS. <br />2.07 GEOSYNTHETICS INSTALLATION CONTRACTOR: <br />The Geosynthetics Installation Contractor, also referred to as the "CONTRACTOR" or <br />"INSTALLER", is responsible for installation of the geosynthetic components, as outlined in the <br />project SPECIFICATIONS. <br />The INSTALLER must meet the requirements outlined in the project SPECIFICATIONS. <br />The INSTALLER will be responsible for storage, handling, deploying, temporary geomembrane <br />anchoring, seaming, repairs and non-destructive testing, in accordance with the project plans, <br />SPECIFICATIONS and the INSTALLER's internal quality control program. It is the INSTALLER's <br />responsibility to see that all submittals are received as outlined in the project SPECIFICATIONS. <br />2.08 EARTHWORKS CONTRACTOR: <br />The Earthworks Contractor, also referred to as "CONTRACTOR" is responsible for proper delivery <br />and placement of earthwork components as outlined in the project SPECIFICATIONS. <br />PART 3.0 LINES OF COMMUNICATION <br />The CQA Monitor shall be capable of direct communication with the MANAGER, DESIGN <br />ENGINEER, CERTIFYING ENGINEER and CONTRACTOR at all times. Deficiencies that can <br />be easily remedied, such as unsatisfactory test results, will be dealt with directly between the CQA <br />Monitor, INSTALLER, and/or CONTRACTORS. <br />If there is a disagreement among the DESIGN ENGINEER, CERTIFYING ENGINEER and/or <br />MANAGER that can not be resolved among themselves, MANAGER shall present the matter to <br />Section 01400.2 Page 3 of 10 March 22, 2000 <br />Geosynthetic CQA Plan Golder Associates Revision 5 <br />-2110\0100\I.INERISOLATIONBARR-ISI.IAYOMTf2CQA_GFASYMHETICS-
The URL can be used to link to this page
Your browser does not support the video tag.