My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-05-15_GENERAL DOCUMENTS - M1980244
DRMS
>
Day Forward
>
General Documents
>
Minerals
>
M1980244
>
2007-05-15_GENERAL DOCUMENTS - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:16:53 PM
Creation date
1/2/2009 3:37:36 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
5/15/2007
Doc Name
Proposed Uncertified Liner Isolation Barrier- AM#8
From
Golder Associates Inc.
To
CC&V
Permit Index Doc Type
Gen. Correspondence
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• coordination of all construction activities associated with the various <br />CONTRACTOR(S); <br />• scheduling and coordinating construction activities with required CQA testing and <br />activities; <br />• overseeing the construction quality control operations performed by the <br />CONTRACTOR(S); <br />• approve specific corrective measures to be implemented during construction when <br />deviations from the SPECIFICATIONS occur; <br />• ensure that required quality control testing has been performed in accordance with the <br />CQA Plan and to the satisfaction of the CQA Monitor; and <br />• ensure that the CQA personnel are provided with all documentation required in the CQA <br />Plan and project SPECIFICATIONS. <br />2.03 DESIGN ENGINEER: <br />In this CQA Plan the DESIGN ENGINEER refers specifically to Golder Associates Inc. The <br />DESIGN ENGINEER is the individual or firm responsible for the design and preparation of the <br />project construction DRAWINGS and project SPECIFICATIONS. The DESIGN ENGINEER is <br />responsible for approving all design and project SPECIFICATION changes, modifications, or <br />clarifications encountered during construction. <br />2.04 CERTIFYING ENGINEER: <br />In this plan, CERTIFYING ENGINEER refers specifically to Golder Associates Inc. <br />CERTIFYING ENGINEER is the individual or firm responsible for certifying the construction was <br />performed in compliance with the DRAWINGS and SPECIFICATIONS. MANAGER and <br />CERTIFYING ENGINEER will be responsible for the resolution of all quality assurance issues. <br />2.05 CONSTRUCTION QUALITY ASSURANCE MONITOR: <br />The Construction Quality Assurance Monitor, also referred to as the "CQA Monitor", is the firm or <br />individual responsible for performing the CQA tasks outlined in this plan. The CQA Monitor is the <br />official CQA representative of CC&V and has the responsibility of overseeing the CQA aspects of the <br />project. In this CQA Plan the CQA Monitor is associated with the CERTIFYING ENGINEER and <br />refers specifically to (To Be Determined). The CQA Monitor has the authority to stop any aspect of <br />the work that is not in compliance with the CQA Plan. Work would then be resumed once corrective <br />action has been approved by the MANAGER and CERTIFYING ENGINEER. The specific <br />responsibilities of the CQA Monitor include: <br />• review the design DRAWINGS, project SPECIFICATIONS, and related guidance <br />documents; <br />• review all CONTRACTOR QC submittals and make appropriate recommendations; <br />• observe geosynthetic material delivery, unloading, and storage; <br />• obtain and test geosynthetic conformance samples during geosynthetics manufacture; <br />• observe prepared subgrade prior to geosynthetic deployment; <br />Section 01400.2 <br />Geosynthetic CQA Plan <br />1:wT31 -oov.wewsouno- m4AVOTATl zCQw cFASYNI"H"C- <br />Page 2 of 10 <br />Golder Associates <br />March 22, 2000 <br />Revision 5
The URL can be used to link to this page
Your browser does not support the video tag.