My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-12-11_REVISION - C1981010
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981010
>
2007-12-11_REVISION - C1981010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:19:16 PM
Creation date
12/24/2008 2:49:27 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
Revision
Doc Date
12/11/2007
Doc Name
Adequacy Concerns
From
DRMS
To
Trapper Mining Inc
Type & Sequence
RN5
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agency or organization name : Division Of Reclamation, Mining And Safety <br />Permit or other job action : RN5 <br />Task description : Regrade West Horse pond <br />......:...... . <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D10R - 10SU (2005) Horsepower : 570 <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 : NA <br />Data source : (CRG) <br />volume : 2,652 CCY <br />factor : 1.125 volume : 2,984 LCY <br />Source of estimated volume: Appendix A Table A-3 <br />Source of estimated swell factor : Caterpillar Handbook Edition 34 <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br />Operator skill : 0.85 (user) <br />Average push distance : 50 feet <br />Unadjusted hourly production : Z748.7 LCY/hr <br />Material consistency description <br />Compacted rill or embankment <br />Average push gradient <br />Average site altitude <br />Material weight <br />Weight description <br />Clay - Wet <br />3.00 % (pos) <br />7,200 feet <br />2,800 Ibs/LCY <br />JOB TIME AND COST <br />Material consistency : 0.90 (Cat HB) <br />Dozing method : 1.00 (gen.) <br />Visibility : 1.00 (avg.) <br />Job efficiency : 0.83 (1 shift/da) <br />Spoil pile : 0.80 (fnd-rf) <br />Push gradient : 0.95 (Cat HB) <br />Altitude : 1.00 (Cat HB) <br />Material weight : 0.82 (Cat HB) <br />Blade type : 1.00 (S/SU/U) <br />Net correction : 0.40 <br />Adjusted unit production : 1087.09 LCY/hr <br />Adjusted fleet production : 1,087.09 LCY/hr <br />Fleet size : 1 Dozer(s) Total job time : 2.74 Hours <br />Unit cost : $0.236 /LCY Total job cost : $703 <br />
The URL can be used to link to this page
Your browser does not support the video tag.