Laserfiche WebLink
Agency or organization name : Division Of Reclamation, Mining And Safety <br />Permit or other job action : RN5 <br />Task description : Regiade Sage #2 pond <br />HOURLY EQUIPMENT COST <br />volume : 3,086 CCY <br />factor : 1.125 volume : 3,472 LCY <br />Source of estimated volume: Appendix A Table A-3 <br />Source of estimated swell factor : Caterpillar Handbook Edition 34 <br />HOURLY PRODUCTION <br />Average push distance : 100 feet <br />Unadjusted hourly production : 1,718.9 LCY/hr <br />Material consistency description <br />Compacted rill or embankment <br />Average push gradient : 3.00 % (i <br />Average site altitude : 6,500 feet <br />Material weight : 2, 650 Ibs/LCY <br />Weight description : <br />Decomposed rock - 25% Rock, 75% Earth <br />Job Condition Correction Factors <br />Operator skill : <br />0.85 Source <br />(user) <br />Material consistency : 0.90 (Cat HB) <br />Dozing method : 1.00 (gen.) <br />Visibility: 1.00 (avg.) <br />Job efficiency : 0.83 (1 shift/da) <br />Spoil pile : 0.80 (fnd-ft) <br />Push gradient : 1.07 (Cat HB) <br />Altitude : 1.00 (Cat HB) <br />Material weight : 0.87 (Cat HB) <br />Blade type : 1.00 (S/SU/U) <br />Net correction : 0.47 <br />Adjusted unit production : 810.25 LCY/hr <br />Adjusted fleet production : 810.25 LCY/hr <br />........... ........ .:..:. <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) Total job time : 4.28 Hours <br />Unit cost : $0.333 /LCY Total job cost : $1,158 <br />Basic machine : Cat D10R - IOSU (2005) Horsepower : 570 <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2: 1-shank ripper