Laserfiche WebLink
Agency or organization name : Division of Reclamation, Mining And Safety <br />Permit or other job action : RN-5 <br />Task description : Regrade Impoundment H <br />................ <br />. <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D10R - 10SU (2005) <br />Blade type : Semi-Universal <br />Attachment no. 1 :ROPS Cab <br />Attachment no. 2 :1-shank ripper <br />Horsepower : 570 <br />Shift basis : 1 per day <br /> Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $97.15 NA <br />Operating cost/hour : $138.49 100 <br />Ripper op. cost/hour : $2.34 20 <br />Operator cost/hour : $32.78 NA <br />Total unit cost/hour : $270.75 Total fleet cost/hour : $270.75 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 2,558 CCY factor : 1.125 volume : 2878 LCY <br />Source of estimated volume: Appendix A Table A-3 <br />Source of estimated swell factor : Caterpillar Handbook Edition 34 <br />HOURLY PRODUCTION <br />Average push distance : 75 feet <br />Unadjusted hourly production : 2,105.3 LCY/hr <br />Material consistency description <br />Compacted fill or embankment <br />Average push gradient <br />Average site altitude <br />1.00 <br />6.500 <br />feet <br />Material weight : Z650 Ibs/LCY <br />Weight description : <br />% (pos) <br />edition Correction Factors <br />Operator skill : <br />0.85 Source <br />(user) <br />Material consistency : 0.90 (Cat HB) <br />Dozing method : 1.00 (gen.) <br />Visibility: 1.00 (avg.) <br />Job efficiency : 0.83 (1shiR/day) <br />Spoil pile : 0.80 (fnd-ri) <br />Push gradient : 0.99 (Cat HB) <br />Altitude : 1.00 (Cat HB) <br />Material weight : 0.87 (Cat HB) <br />Blade type : 1.00 (S/SU/U) <br />Net correction : 0.44