Laserfiche WebLink
A crack running perpendicular to the hill slope was found along the '9'1", <br /> central portion of H-C-04 heading toward H-C-03. It averages about i,-' <br /> I —2 inches wide and is approximately 400 feet long. This narrow Ni <br /> solitary crack is not a major concern warranting a disturbance to the , 0. <br /> surface. However, I would recommend monitoring the site— A <br /> especially after significant rainstorm events. <br /> Fig.2:H-C-04 crack <br /> The drainage channel on the southeastern portion of H-C-03 is showing signs of erosion and <br /> down-cutting (see figure 3). This channel has only a few check dams. We discussed excluding <br /> the channel and proceeding with Phase I & II release for the <br /> surrounding area, but that does not appear to be TMI's preferred <br /> £; option. Mr. Luke is concerned about bringing heavy equipment <br /> in to the area and would prefer to put brush in the channel to <br /> assist its healing process. We discussed the size of the <br /> � .�. � watershed, its slope,the channel's curves, and other challenges <br /> r <br /> TMI faces. We agreed the channel needs work and will be <br /> revisited by DRMS (Jason Musick) and, if possible, OSM <br /> (Christine Belka) before Phase I &II bond release is <br /> ranted. The surrounding area is well-vegetated and appears <br /> g g g pp <br /> Fig.3:H-C-03 eroding channel stable. <br /> H-C-98 and H-B-98 are proposed for Phase III bond release. The areas stand out from <br /> surrounding reclamation by the presence of 6-foot tall grasses. The drainage channel has been <br /> maintained using brush to help heal downcut areas. This.approach appears largely successful; <br /> however, some small areas show signs of erosion. The surrounding area is well-vegetated and <br /> stable. <br /> Tuesday began in the central region of the proposed bond release area(Map Sheet 2) in the F- <br /> AB-05 plot proposed for Phase 1 bond release. Jennifer Miaolo (BLM) accompanied us this day <br /> and we briefed her on the bond release process, what we saw on Monday, and seeding/ <br /> vegetation sampling methods employed at the Trapper Mine. <br /> Vegetation did not establish along the southeast side of F- � � <br /> AB-05 (proposed Phase I) and numerous rills are forming ,fR AIR- <br /> �� � <br /> (see figure 4). The designated drainage ditches cutting <br /> across the slope collects these rills, but the rills become e,,5 �r= � , <br /> larger where the cut through diversion embankments. i <br /> g Y b � ' <br /> Russian thistle is the predominant plant(weed) in the area <br /> with very little grass or other vegetation. This area appears <br /> reasonably stable for Phase I bond release. However, it will <br /> require special attention before meeting Phase II3 <br /> requirements. <br /> Figure 4:F-AB-05 no vegetation/rills forming <br /> Adjacent areas look significantly better. F-AB-02, F-AB-03, and F-AB-04 are proposed for <br /> Phase I& II bond release (F-AB-02 is Phase II only). A distinct vegetation line marks the barrier <br />