My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-12-04_PERMIT FILE - M2008070
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2008070
>
2008-12-04_PERMIT FILE - M2008070
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:38:37 PM
Creation date
12/11/2008 3:44:51 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008070
IBM Index Class Name
PERMIT FILE
Doc Date
12/4/2008
Doc Name
Preliminary adequacy review
From
DRMS
To
JSC, Inc.
Email Name
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Rule 3.1.13 for spill reporting is adequate. However, because an asphalt plant is <br />proposed please submit a plan for the weekly clean up of any asphalt over spill <br />and reject material. Please explain what measures will be in place to prevent it <br />from being spread across the permitted site. The plan should note that a single <br />specific area in each phase that will be used to accumulate overspill and reject and <br />its final disposal method. <br />6.4.6 - Exhibit F the Reclamation Map. Please provide a map for the Office / Scale <br />area. <br />6.4.7 - Exhibit G Water Information. As noted water issues have been addressed with <br />OSE and no groundwater will be exposed during the mining operation. <br />6.4.8 - Exhibit H, Wildlife is adequate. <br />6.4.9 - Exhibit I, Soils is adequate. <br />6.4. 10 - Exhibit J, Ve etg ation is adequate. <br />6.4.11 - Exhibit K, Climate is adequate. <br />6.4.12 - Exhibit L, Reclamation Costs are acceptable at this time. However, staff will <br />calculate an estimated reclamation liability after all adequacy issues are <br />addressed. <br />6.4.13 - Exhibit M, Other Permits. It is noted that the Corp of Army Engineers has not to <br />date made any comments regarding the proposed activity. Please clarify if the <br />Corp was contacted by the applicant. <br />Please list the BLM right of way agreement under this section. <br />6.4.14 - Exhibit N Source of Legal Right to Enter appears to be acceptable. <br />6.4.15 - Exhibit O, Owners of Record appears to be acceptable. <br />6.4.16 - Exhibit P Municipalities within 2 miles. It is noted that there are no <br />municipalities within 2 miles of the project. <br />6.4.17 - Exhibit Proof of Notice to County Board and Soil Conservation is adequate. <br />6.4.18 - Exhibit R Proof of Filing with County Clerk is acceptable.