My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-12-04_PERMIT FILE - M2008070
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2008070
>
2008-12-04_PERMIT FILE - M2008070
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:38:37 PM
Creation date
12/11/2008 3:44:51 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008070
IBM Index Class Name
PERMIT FILE
Doc Date
12/4/2008
Doc Name
Preliminary adequacy review
From
DRMS
To
JSC, Inc.
Email Name
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6.4.4 - Exhibit D ,.Mining Plan <br />(a) Adequate, addressed through Mine Plan Narration <br />(b) Adequate, addressed through Mine Plan Narration <br />(c) Adequate, addressed through Mine Plan Narration <br />(d) Adequate, addressed through Mine Plan Narration <br />(e) Adequate, addressed through Mine Plan Narration <br />(f) Adequate, addressed through Mine Plan Narration <br />(g) Adequate, addressed through Mine Plan Narration <br />(h) Adequate, addressed through Mine Plan Narration <br />(i) Adequate, addressed through Mine Plan Narration. <br />Please clarify that no disturbances are planned in the Future Bridge and Access <br />Area. <br />Please clarify what disturbances and activities will occur in the Office / Scale <br />Area. <br />Please clarify what gas line protection requirements will be required by CIG. <br />6.4.5 - Exhibit E, Reclamation Plan <br />(1) Is adequate per plan narration. However staff recommends committing to a <br />range of topsoil placement of 4 to 8 inches with an average of 6 inches. This <br />allows some latitude in case there is less soil than anticipated or for minor <br />irregularities during reclamation work. <br />(a) Please include reclamation of the Office / Scale Area in reclamation plans. <br />(b) Is adequate per plan narration <br />(2)(c) Please refer to Rule 3.1.: <br />3.1.1 is adequately addressed. <br />3.1.2 is not applicable. <br />3.1.3: is adequately addressed. <br />3.1.4 is not applicable. <br />3.1.5: Materials Handling <br />(1) is adequate per reclamation plan narration <br />(2), is adequate per reclamation plan narration with the following clarification that <br />no highwalls will exist and mining will be done at a maximum 2:1 slope. <br />(3) is adequate per reclamation plan narration <br />(4) is adequate per reclamation plan narration <br />(5) not applicable <br />(6) not applicable <br />(7) is adequate per reclamation plan narration, mining at 2:1 and reclaimed to 3:1 <br />slopes <br />(8) not applicable <br />(9) not applicable
The URL can be used to link to this page
Your browser does not support the video tag.