Laserfiche WebLink
Jan 29 08 11:04a Greg Lewicki and Associat <br /> <br />Reclamation Timetahle <br />3033466934 p.5 <br /> <br /> <br />Task # <br /> <br />Description Time <br />needed <br />(years) <br /> <br />1 Stripping of topsoil and mining year 1 gravel, construct 2 topsoil <br />stockpiles and reclaim northern end of current it. <br />1 <br />2 Stripping of minor topsoil and mining year 2 gravel. 1 <br />3 Stripping of minor topsoil and mining year 3 gavel. 1 <br />4 Mining year 4 gravel. 1 <br />5 Striing of topsoil and mining year 5 gravel. 1 <br />6 Stripping of to soil and mining year 6 gravel. 1 <br />7 Stripping of topsoil and mining year 7 gravel. 1 <br />8 Stripping of topsoil and mining year 8 gavel. 1 <br /> <br />9 Stripping of topsoil and mining year 9 gravel and reclaim portion of <br />year 8 area. <br />1 <br />10, Stripping of topsoil and mining year 10 gravel. I <br /> <br />11 Stripping of topsoil and mining year 11 gravel, and reclaim year 10 <br />slopes which are mined 3H:1 V <br />1 <br /> <br />12 Stripping of topsoil and mining year 12 gravel, and reclaim year 11 <br />slopes which are mined 3H:1 V. This is a large reclamation area. <br />1 <br /> <br />13 Stripping of topsoil and mining year 13 gravel, and reclaim year 12 <br />slopes which are mined 314:1 V. <br />1 <br /> <br />14 Stripping of topsoil and mining year 14 gravel, and reclaim year 13 <br />slopes which are mined 3H:1 V. <br />1 <br /> <br />15 Mining year 15 gravel, and reclaim year 14 slopes which are mined <br />3H:IV <br />1 <br /> <br /> <br />16 11 Mining year 16 gravel, and reclaim year 15 slopes which are mined <br />3H:1 V. Move all topsoil out of existing stockpiles (3) to reclaim the <br />remainin disturbed area. <br /> <br />1 <br />Total 16 <br />Once the final mining area is completely excavated, it will take approximately 4 months to do <br />final backfilling, topsoil replacement from the 3 berms, seedbed preparation and final seeding <br />and mulching. As seen on Map F-1, the total area consists of the following: <br />Area I - main mine area: 29.47 acres <br />Area 2 - topsoil berms and roads: 7.56 acres <br />Area 3 - employee housing disturbed area: 2.78 acres <br />Total area for seeding and mulching at the end of the mine life: 39.81 acres <br />Vagneur Pit June 07 E-3