location will be surveyed and mapped. Exploration will be done using a self-leveling, 10-wheel <br />Davey Drill Truck, which has the capability of driving to each borehole location with minimal <br />disturbance. Drilling will be by air rotary methods, minimizing equipment and materials and <br />resulting in a net disturbed area of less than 350 square foot per borehole. Thus, although many <br />sites will require no reclamation (drilled in existing mine road or drill road and/or in bedrock), a <br />maximum of 2.4 acres could be disturbed. Detailed completion information will be submitted as <br />the holes are completed. <br />Because of the minimal amount of impact of this drilling activity, there is no need to remove any <br />topsoil. All activities will be conducted by carefully accessing the site with minimal disturbance. <br />The exploration borehole area will be reclaimed continuously, as each borehole is completed and <br />the drilling rig moves to the next location. <br />4. Re-seeding of Disturbed Areas <br />(a) As previously described, exploration drilling and mining will be all on existing disturbances. <br />Minor additional acreage will be disturbed as access roads are widened and ditches cut or berms <br />constructed on uphill side for surface drainage control. <br />Table F-1 _ Pronosed Surface Disturbance. <br />Area Description Previously Disturbed acres Total Disturbed Area acres <br />Parking and staging area 0.92 2.2 <br />Monogram Pit disturbed area 1.5 2.0 <br />Overburden Stockpile 0 0.2 <br />Road improvements for hauling <br />and drilling 2.0 2.8 <br />Exploration borehole sites 2.0 2.4 <br />Estimated acreage disturbed 6.42 9.6 <br />The current surface land owner prefers that the general area be left as is for recreational purposes <br />with reclamation being limited to filling in hazardous or dangerous adits and shafts and erodible <br />roads or trails. Thus, only an additional 3.2 acres will be disturbed and reclamation will be <br />limited to about 6.8 acres. Most of the planned disturbance is reclaimed concurrently such as the <br />sections of the Monogram Mine or individual boreholes and thus costs are ongoing. Assuming <br />that all re-vegetation reclamation was completed at the end of the mining project, costs, <br />including re-contouring the land surface, scarifying, and seeding and mulching (certified weed <br />free hay or straw mulch) is estimated to have a unit cost of about $1100/acre; a total of <br />$7,480.00. <br />Another major aspect of reclamation will be breaking up and removing the ore bins from the <br />staging area. The pad and bin contain about 56 cubic yards of concrete which will cost about <br />$40 per yard to remove and dispose of for an estimated cost of $2,240. <br />Reclamation will be concurrent with the exploration and development efforts and complete <br />within six months of termination of mining efforts. In the event that further underground mining <br />is warranted, a major permit revision will be prepared and include revised reclamation costs and <br />timetables. <br />Monogram Mine - November 2008 <br />E-2