Laserfiche WebLink
•_:. -_ <br /> • Parcel H-C-04 (26.2ac), SL-08 Phase 1 and SL-09 Phase II — Reclaimed area contains a small <br /> dragline walk road eastward into the reclamation with evidence of a small gully running the <br /> length of the road on the north and east sides. The gully was noted as showing signs of down <br /> cutting with little vegetation establishment in the gully. Brush repair was conducted and down <br /> cutting eliminated through wheel rolling and filling of the deeper areas of the gully. See <br /> photos below: <br /> • Z-AB-05 (29.1ac), SL-8 Phase 1 — Large rills established on the northern slope out of the <br /> contour ditch. Contour ditch showed evidence of overtopping and blow-outs in 3 locations in <br /> the ditch and evidence of past two track road through SC-Z-01 and down the west side of the <br /> parcel. Gullies are down cutting due to runoff in the two tracks. Contour ditches were <br /> removed from the northern slop of the parcel. Gullies were brushed repaired. See photos <br /> below. <br />