Laserfiche WebLink
1. Provide northing, easting, and elevation for all Soil Liner Fill depth <br />verifications. <br />2. Provide northing, easting, and elevation for geomembrane panel <br />intersections and destructive samples. <br />3. Provide continuous northing, easting, and elevation reference for field <br />testing and sampling location identification. <br />4. Provide depth verification for he Low Volume Solution Collection Fill <br />on a 50-foot by 50-foot grid with additional points at all grade breaks, <br />5. Provide depth verification for Drain Cover Fill on a 50-foot by 50-foot <br />grid with additional survey points at all breaks in grade. <br />6. Provide northing, easting and elevation reference for any underground <br />working confirmatory drillhole and blasthole locations. <br />Northings, eastings, and elevations for Items 1, 2, 3 and 6 will be performed on a <br />daily basis and results will be provided to the MANAGER in both electronic and <br />hardcopy format within 24 hours of performing the survey. <br />* * * END OF SECTION * * * <br />Section 01050 Page 3 of 3 March 22, 2000 <br />Construction Staking Golder Associates Revision 3 <br />I:\M2W9XfmW reporAWece\01050r3.d0a