Laserfiche WebLink
This plan addresses the construction quality assurance (COA) procedures for the <br />installation of the earthworks (soils) components of the valley leach facility at the Cresson <br />Project, Teller County, Colorado. This program has been developed to assure that the <br />construction of the soil components are in compliance with the project SPECIFICATIONS <br />and to demonstrate that the regulatory requirements for the construction are achieved. <br />The objective of this plan is to assure that proper materials, construction techniques, and <br />procedures are followed by the CONTRACTOR and that the intent of the design is met. <br />This plan also provides the means for resolution of problems that may occur during <br />construction. <br />This plan addresses quality assurance, not quality control. This CQA Plan is independent <br />of the quality control (QC) programs conducted by CONTRACTOR. The intent of the CQA <br />Plan is to provide independent third party verification and testing, to demonstrate that the <br />CONTRACTOR has met its obligations in the supply and installation of earthwork (soils) <br />materials according to the design, project SPECIFICATIONS, contractual, and regulatory <br />requirements. Quality control is provided by CONTRACTOR and refers to those actions <br />taken by the CONTRACTOR to ensure that materials and workmanship meet the <br />requirements of the DRAWINGS and SPECIFICATIONS. <br />PART 2.0 DESCRIPTION OF PARTIES TO CONSTRUCTION QUALITY ASSURANCE <br />The following section provides descriptions of the parties to this COA Plan including their <br />responsibilities and qualifications. <br />2.01 CC&V : <br />In this COA Plan, CC&V refers specifically to Cripple Creek & Victor Gold Mining <br />Company. CC&V owns and operates the valley leach facility. <br />2.02 MANAGER: <br />In this COA Plan, MANAGER refers to the individual appointed by the Cripple Creek & <br />Victor Gold Mining Company. MANAGER is the official representative of CC&V and is <br />responsible for all construction activities including oversight and direction during <br />construction. MANAGER is also responsible for coordinating construction and COA <br />activities for the project. <br />MANAGER shall serve as communications coordinator for the project, initiating <br />preconstruction and resolution meetings. As communications coordinator, MANAGER will <br />serve as a liaison between all parties involved in the project to ensure that ongoing <br />communications are maintained. MANAGER and CERTIFYING ENGINEER shall be <br />responsible for the resolution of all COA issues. <br />Duties for this position include the following: <br />? review and approval of DRAWINGS and SPECIFICATIONS for ail soil <br />components of the valley leach facility; <br />Section 01400.1 Page I of 11 March 22, 2000 <br />Earthworks COA Plan Golder Associates Revision 5 <br />1AM2099\flnal reparAVecA014001r6.doc