My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-10-30_REVISION - M1980244
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2008-10-30_REVISION - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:37:34 PM
Creation date
10/31/2008 8:17:15 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
10/30/2008
Doc Name
TR Submittal- Phase IV b/c Perimeter Liner Extension
From
CC&V
To
DRMS
Type & Sequence
TR52
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
be carried out on a 100-foot by 100-foot grid with additional survey points <br />required to define valley leach facility topographic features (i.e., toe of slope, crest <br />of slope, breaks in grade), unless otherwise directed by MANAGER. The Record <br />Drawings shall include elevations and locations for the following: <br />? Underdrain plan view showing the limits of the valley leach facility. <br />Underdrain Fill and underdrain alignment, with elevations every <br />approximately 100 feet or on every break in grade <br />? Diversion channel plan and profile view along the diversion channel <br />alignment <br />? Leak detection trench plan view showing the limits of the valley <br />leach facility, leak detection trench alignment, and leak detection <br />sumps, with elevations every approximately 100-feet <br />? Soil Liner Fill plan view showing the limits of the valley leach facility, <br />with contours of the Soil Liner Fill and Bedding Fill surface on a 10- <br />foot contour interval, including the regraded ore slopes and end <br />berms <br />? Low Volume Solution Collection piping plan showing the limits of the <br />composite liner, double liner and single liner, and piping alignment <br />with elevations every approximately 100 feet <br />? Perimeter access roads <br />? Top of Upper geosynthetics in the Pregnant Solution Storage Area, <br />including the Vertical Riser Sump and base plates <br />? High Volume Solution Collection piping plan showing the limits of <br />Phase III, and piping alignment with elevation every approximately <br />100-feet <br />In addition, the Colorado licensed surveyor will provide a surveyor's certificate to <br />be submitted in the Construction Certification Report. <br />C. Submittal: <br />CONTRACTOR will submit completed as-built documentation within seven (7) <br />calendar days upon completion of the work in the following manner: <br />1. Submit two (2) reproducible copies (mylar) to the MANAGER. <br />2. Submit two (2) non-reproducible copies to the MANAGER on IBM <br />compatible compact disks (CD) on AutoCAD Version 14.0 or newer <br />format. <br />D. The CONTRACTOR will be responsible for performing the following survey <br />activities associated with the Construction Certification Report: <br />Section 01050 Page 2 of 3 March 22, 2000 <br />Construction Staking Golder Associates Revision 3 <br />1:199%208 fkW report%SPe=%01050r3.d0c
The URL can be used to link to this page
Your browser does not support the video tag.