My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-10-30_REVISION - M1980244
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2008-10-30_REVISION - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:37:34 PM
Creation date
10/31/2008 8:17:15 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
10/30/2008
Doc Name
TR Submittal- Phase IV b/c Perimeter Liner Extension
From
CC&V
To
DRMS
Type & Sequence
TR52
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.01 SUMMARY: <br />This Section defines the control staking services required by the CONTRACTOR. All <br />staking and surveying will be the responsibility of the CONTRACTOR unless otherwise <br />specifically defined in this section. All grade checking and transferring of lines and grades <br />from CC&V's stakes will be the CONTRACTOR'S responsibility. <br />1.02 CONTROL STAKES: <br />Control stakes which are reference points for all construction work will be conspicuously <br />marked. It shall be the responsibility of the CONTRACTOR to inform his employees and <br />his subcontractors of their importance and the necessity for their preservation. At least <br />forty-eight (48) hours written advance request for removal of control stakes shall be given <br />to CC&V. A total of ten (10) control stakes will be provided to the CONTRACTOR by <br />CC&V for this work. <br />Control stakes shall be set one time only. <br />1.03 FLAGGING CODE: <br />A color code will be established by the CONTRACTOR during the course of the project <br />indicating specific colors for the various kinds of stakes to be set. <br />1.04 STAKING: <br />A. CC&V will provide vertical and horizontal reference control stakes in the proximity <br />of the work as discussed in Article 1.02 of this Section. <br />B. The CONTRACTOR shall be responsible for setting construction and grade stakes <br />and for proper preservation of control points. <br />C. The CONTRACTOR will provide as-built coordinates and elevations for the <br />Underdrains, Leak Detection system, Low Volume Solution Collection piping and <br />High Volume Solution Collection piping or as requested by the MANAGER. <br />1.05 CONSTRUCTION CERTIFICATION DOCUMENTATION: <br />A. The CONTRACTOR shall be responsible for accurately surveying the locations and <br />elevations, and where applicable, the type, thickness, and geometry of any and all <br />pipes and fittings, ditches, geosynthetic materials, breaks in fill or cut slopes, <br />general grading, change in fill or synthetic material type, and any other aspect of <br />the work to facilitate construction and as required by the MANAGER. <br />B. Submittals By CONTRACTOR Upon Completion of Work: <br />Within seven (7) calendar days after completion of the WORK, CONTRACTOR <br />shall furnish MANAGER with "Record Drawings" (also referred to as "As-Built <br />Drawings") of the Work. The Record Drawing will be drawn at a scale of 1-inch <br />equals 100 feet with 10 foot topographic contour interval, and on a 24-inch by <br />36-inch sheet. All surveying Record Drawings shall be signed and sealed by the <br />Colorado licensed surveyor who directed the work. The required surveying shall <br />Section 01050 Page 1 of 3 March 22, 2000 <br />Construction Staking Golder Associates Revision 3 <br />1:199%2099\rxw report p9w%0105*3.doc
The URL can be used to link to this page
Your browser does not support the video tag.