My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-06-03_REVISION - C1980007
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1980007
>
2008-06-03_REVISION - C1980007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:32:27 PM
Creation date
10/24/2008 8:42:10 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
REVISION
Doc Date
6/3/2008
Doc Name
Reclamation Cost Estimate
From
DRMS
To
File
Type & Sequence
MR347
Email Name
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Blade type : Semi-Universal <br />Attachment no. 1 :ROPS Cab Shift basis : 1 perday <br />Attachment no. 2:3-shank ripper <br />Data source : (CRG) <br />volume : 8,793 BCY <br />factor : 1.330 volume : 11,695 LCY <br />Source of estimated volume : 5.45 X 1 ft. deep <br />Source of estimated swell factor : CAT Handbook <br /> <br /> <br />HOURLY PRODUCTION ... <br />Job Condition Correction Factors :::::.. <br />Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 100 feet Material consistency : 0090 (Cat HB) <br />Unadjusted hourly production : 1,243.2 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shift1day) <br />Compacted fill or embankment Spoil pile : 0.80 (fnd-rt) <br /> Push gradient : 0.93 (Cat HB) <br />Average push gradient : 4.00 % (pos) Altitude : 0.95 (Cat HB) <br />Average site altitude : 7,700 feet Material weight : 0.79 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,900 Ibs/LCY Net correction : 0.31 <br /> <br />Weight description : <br />Decomposed rock - 50% Rock, 50% Earth Adjusted unit production : 388.67 LCY/hr <br /> Adjusted fleet production : 388.67 LCY/hr <br /> <br />:.;:.;:.;:: > : <br />JOB TIME AND COST ................... .......... . <br />Fleet size : 1 Dozer(s) Total job time : 30.09 Hours <br />Unit cost : $0.526 /LCY Total job cost : $6,154 <br /> X.X
The URL can be used to link to this page
Your browser does not support the video tag.