Laserfiche WebLink
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task # : 11C State : Colorado Permit/job# : C-80-007 <br />Date : 0610312008 County :Delta Abbreviation :none <br />User : TAK Site : West Elk Mine Filename : 0007-11 c <br /> <br />Agency or organization name : Colorado Division Of Mining, Reclamation And Safety <br />Permit or other job action : TR-111 <br />Task description : Regrade MDW pads approved in TR-111 <br /> <br />::. ... <br />HOURLY EQUIPMENT COST ...:.................. ........ ................................ .................................................................... ............................ .............. <br />.............. <br /> Basic machine : Cat D9R - 9SU (2005) Horsepower : 405 <br /> Blade type : Semi-Universal <br /> Attachment no. 1 : ROPS Cab Shiftbasis : 1 per day <br /> Attachment no. 2:3-shank ripper <br /> Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour: $72.92 NA <br /> Operating cost/hour : $98.84 100 <br /> Ripper op. cost/hour : $0.00 0 <br /> Operator cost/hour : $32.78 NA <br /> Total unit cost/hour : $204.53 Total fleet cost/hour : $204.53 <br /> <br />MATERIAL QUANTITIES ........................................................................................ ............................ ............................ <br />Initial Swell Loose <br />volume : 7,325 BCY factor : 1.330 volume : 9,742 LCY <br /> <br />Source of estimated volume 4.54 acres X 1 ft. deep <br />Source of estimated swell factor : CAT Handbook <br /> <br />.. ........ ................. ..................................... <br /> <br />HOURLY PRODUCTION ........................... <br />.................................................................:;::.:;:.::::::: <br />Job Condition Correction Factors <br />:.......................... <br />::::::. <br />Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 100 feet Material consistency : 0.90 (Cat HB) <br />Unadjusted hourly production : 1,243.2 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shiff1day) <br />Compacted rill or embankment Spoil pile : 0.80 (fnd-rf) <br /> Push gradient : 0.93 (Cat HB) <br />Average push gradient : 4.00 % (pos) Altitude : 0.95 (Cat HB) <br />Average site altitude : 7,700 feet Material weight : 0.79 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2900 Ibs/LCY Net correction : 0.31 <br />Weight description : <br />Decomposed rock - 50% Rock, 50% Earth Adjusted unit production : 388.67 LCY/hr <br /> Adjusted fleet production : 388.67 LCY/hr <br /> <br /> <br />JOB TIME AND COST ............................................................................ ............................ ............................ <br />Fleet size : 1 Dozer(s) Total job time : 25.07 Hours <br />Unit cost : $0.526 /LCY Total job cost : $5,127 <br />