Laserfiche WebLink
Refuse material is planned to be transported to the refuse disposal area (RDA) by overland <br />conveyor. This conveyor corridor will cross the gullies at an oblique angle toward the RDA <br />location. The conveyor is planned to leave the prep plant area and cross below the slope <br />from approximately where the vehicles are parked to the lower right corner of the photo <br />below. <br /> <br /> <br />;c -r <br /> <br />1 <br />Along the foot traverse across the proposed RDA, two interesting features were noted on the <br />northwest edge of the RDA. These peculiar "rock features" could have some cultural <br />significance and should be investigated if they have not been already. <br />n, <br />.. <br /> <br /> <br /> <br />