My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-09-17_REVISION - M1980244 (28)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2008-09-17_REVISION - M1980244 (28)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:18 PM
Creation date
9/19/2008 7:43:12 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
9/17/2008
Doc Name
Response to Adequacy Review
From
CC&V
To
DRMS
Type & Sequence
AM9
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
required for the emergency generators, all other fuel delivery trucks will access the property <br />• through the Ironclad Security Gate on the northern portion of the property and will not need <br />to go through the City of Cripple Creek. <br />8) Construct a new Geology building in the Ajax head frame area. <br />Response: <br />As is noted, part of the MLE Project includes a new Geology building that is proposed to be <br />constructed near the Ajax headframe. The removal of the existing Geology building is needed <br />to facilitate mining activities in the area of the proposed Wildhorse Extension portion of the <br />East Cresson mining area. <br />9) Re-locate the existing sub-station. <br />Response. <br />Just to clarify this statement, the substation relocation will occur even if the MLE Project <br />does not move forward and is not proposed as part of the MLE Project. All work associated <br />with this substation relocation is being performed by Aquila (Black Hills Power). <br />10) Incorporate Permit # M-1991-134 (The Cameron Project) into the Cresson permit area (M- <br />• 1980-244. <br />Response. <br />As is noted, CC&V proposes to incorporate Permit M-1991-134 (The Cameron Project) in <br />the Cresson Project Permit area M-1980-244. <br />11) The total affected area permit acreage as proposed under this Amendment are as follows: 1) <br />1498 acres surface mine areas 2) 616 acres, overburden storage areas, 3) 514 acres valley leach <br />facility and 4) 15.4 acres Carlton Tunnel Discharge area, for a total of 4199 acres. The total <br />affected area includes major disturbances of 2,830.2 acres, ancillary disturbances of 1354.3 <br />acres, plus the 15.4 acres of disturbances at the Carlton Tunnel Discharge area. <br />Response: <br />The total affected areas by approximate acreages are correct in this statement and as was <br />presented in Table 1-1 of the MLE Project application. <br />I) Exhibit A-Legal Description-Rule 6.1. <br />This section is adequate as submitted. <br />Response: <br />• Thank you in your assessment that concluded that the Legal Description - Rule 6.1 was <br />adequate as submitted in the MLE Project Application. <br />
The URL can be used to link to this page
Your browser does not support the video tag.