Laserfiche WebLink
The separated inert clean soil with negligible amounts <br />of asphalt and concrete and the crusher fines are then <br />to be utilized to create a stable soil on this <br />property that is suitable for future industrial <br />development. The inert clean soils material with <br />negligible amounts of asphalt and concrete are first <br />utilized as fill material below the water table. Above <br />the water table, except in areas of future detention <br />ponds, the inert clean soil. material is also blended <br />with the crushed fines to create a compacted stable <br />soil. In the areas of future detention ponds, large <br />pieces of crushed aggregate material may also be <br />utilized to facilitate percolation of stormwater in <br />the future from these ponds. <br />4. The area of disturbance is 13+_ acres in size, which <br />includes areas where minor disturbance will be <br />undertaken to store soil material, to install erosion <br />control measures, and planting of slope areas. <br />The site is already fenced and no additional measures <br />are necessary to control access to the fill area. <br />Ongoing during the life of the filling, the operator <br />will make sure this fence and gate onto. the I-76 <br />Service Road is maintained and repaired as necessary <br />to prevent unauthorized access to the site. <br />The initial activities on the site will be to install <br />appropriate erosion and sediment control measures in <br />accordance with a SWMP Permit that will be obtained <br />from CDPHE, before the stripping of any soil material <br />from any portion of the site or other earthmoving <br />activities on the site. After installation of the <br />appropriate erosion control measure, existing soil in <br />the areas of the site to be mined and backfilled will <br />be stripped and stored for later use as final cover <br />and for revegetation activities at the conclusion of <br />reclamation. <br />2