Laserfiche WebLink
Agency or organization name : DRMS <br />Permit or other job action : AM-02 Bond Estimate <br />Task description: Regrade Pit Slopes to 3:1 <br />::::: <br />............................................................................................................. <br />HOURLY :::::::......................... ................................................ <br />EQUIPMENT CO:ST <br />Basic machine : Cat D8R Series 11- 8SU (200: Horsepower : 310 <br />Blade type : Semi-Universal <br />Attachment no. 1 :ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 : NA <br />Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $50.32 NA <br />Operating cost/hour : $77.13 100 <br />Ripper op. cost/hour : $0.00 NA <br />Operator cost/hour : $32.78 NA <br />Total unit cost/hour : $160.22 Total fleet cost/hour : $160.22 <br />MATERIAL,61JANTITIES ::::.:.:............................................................. <br /> <br />Q <br />_ ........ <br />.............................. <br />................................................ _ _....:.....::.:.:.:.::.......:......:::::.:: <br />................................................. .............................................. <br />Initial Swell Loose <br />volume : 60,000 LCY factor : NA volume : 60,000 LCY <br />Source of estimated volume :DRMS <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION <br />Average push distance <br />Unadjusted hourly production <br />Material consistency description <br />Consolidated stockpile <br />100 feet <br />852.6 LCY/hr <br />Average push gradient : <br />Average site altitude : <br />Material weight <br />Weight description <br />Earth - Drv Dacked <br />10.00 %() <br />5,000 feet <br />2,550 Ibs/LCY <br />Job Condition Correction Factors <br />Operator skill : <br />0.75 Source <br />(avg.) <br />Material consistency : 1.00 (Cat HB) <br />Dozing method : 1.00 (gen.) <br />Visibility: 1.00 (avg.) <br />Job efficiency : 0.83 (1shift1day) <br />Spoil pile : 0.80 (find-rf) <br />Push gradient : 0.79 (Cat HB) <br />Altitude : 1.00 (Cat HB) <br />Material weight : 0.90 (Cat HB) <br />Blade type : 1.00 (S/SU/U) <br />Net correction : 0.35 <br />Adjusted unit production <br />Adjusted fleet production <br />301.20 <br />301.20 <br />LCY/hr <br />LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) Total job time : 199.20 Hours <br />Unit cost : $0.532 /LCY Total job cost : $31,916