Laserfiche WebLink
:Xxx X: <br />ROADABLE EQUIPMENT <br />sheet 2 of 2 <br />Transportation Cycle Time : Non- <br /> Roadable <br /> Equipment <br />Haul time (hours) = 0.04 <br />Return time (hours) = 0.04 <br />Loading time (hours) = 0.50 <br />Unloading time (hours) = 0.50 <br />Subtotals = 1.09 <br />Nearest major city or town within project area region : Brighton <br /> Total one-way travel distance : 2.0 miles <br />Roadable Average travel speed : 45.0 mph <br />Equipment <br />0.04 Total non-roadable mob/demob cost $2,672.68 <br />0.04 * two round trips with haul rig <br />NA Total roadable mob/demob cost ** : $0.00 <br />NA •• one round trip, no haul rig <br />0.09 <br />JOB TIME AND COST <br />Total job time : 2.18 hours <br />Total job cost : $2.673 <br />tQUIPMENT HAUL DISTANCE and TIME