My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-08-11_REVISION - M1997058
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1997058
>
2008-08-11_REVISION - M1997058
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 3:01:40 PM
Creation date
8/11/2008 3:02:09 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1997058
IBM Index Class Name
REVISION
Doc Date
8/11/2008
Doc Name
Adequacy review
From
DRMS
To
Civil Resources
Type & Sequence
AM2
Email Name
PSH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />MENT MOBILIZATION / DEMORIL12 <br />PROJECT IDENTIFICATION <br />Agency or organization name : DRMS <br />Task #: 016 State : Colorado <br />Date : 0810712008 County: Weld <br />User : PSH Site : Baseline <br />sheet 1 of 2 <br />Permit/job # : M1997058 <br />Abbreviation :none <br />Filename : M058-016 <br />Permit or other job action :Am-01 Bond <br />Task description : Mob/Demob <br /> <br />:.::.............................................................................................................. <br /> <br />QUIPMEN..T TRANSPORT RIG COST <br />E ................................................................... <br /> <br />Shift basis : ..................................................... <br />......... <br />1 per day <br /> Cost data source : CRG Data <br />Truck tractor description : Generic on-highway truck tractor, 6x4, diesel powered, 400 HP (2nd half, 2006) <br />Truck trailer description : Generic folding gooseneck, drop deck equipment trailer (25T, 50T, and 1007) <br />Available rig capacities : 0-25 Tons 26-50 Tons 51+ Tons <br />Cost Breakdown : Ownership cost/hour : $16.63 $18.37 $22.33 <br />Operating cost/hour : $44.38 $46.13 $50.07 <br />Operator cost/hour : $27.66 $27.66 $27.66 <br />Helper cost/hour : $0.00 $25.39 $25.39 <br />Total Unit Cost/hour : $88.67 $117.55 $125.45 <br />NON-ROADABLE EQUIPMENT <br />Machine <br />Description Weight/unit <br />(Tons) Ownership <br />Cost/hr/unit Haul Rig <br />Cost/hr/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet DOT permit <br />Cost/fleet <br />-CAT 815F 22.97 $37.70 $88.67 1 $126.37 $88.67 $0.00 <br />-Cat D8R Series 11- 8SU (20 52.55 $50.32 $125.45 1 $175.77 $125.45 $0.00 <br />-Centrifugal pump - 90M, 6 i 1.11 $32.10 $88.67 4 $483.07 $354.68 $0.00 <br />-Cat 627G 40.90 $55.31 $117.55 2 $345.73 $235.10 $0.00 <br />-Water Tanker, 5,000 Gal. 15.00 $21.89 $88.67 1 $110.56 $88.67 $0.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $1,241.49 $892.57 $0.00
The URL can be used to link to this page
Your browser does not support the video tag.