Laserfiche WebLink
sheet 1 of 2 <br />CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task #: <br />Date : <br />User: <br />Agency or organization name : DRMS <br />020 State : Colorado <br />0810812008 County: Weld <br />PSH Site : Baseline <br />Permit or other job action :Am-02 Bond Estimate <br />Task description : Move Topsoil Stockpile <br />.... :::::................................................................................................................................................................ <br />HOURLY EQUIPMENT x: COST <br />Shift basis : 1 per day <br />Cost Brf <br />Support equipment -Load area :NA <br />-Dump area :INA <br />WCR 231/2 <br />Scraper work team -Scraper :ICat 627G <br />-Push dozer:NA <br />Road maintenance -Motor grader: NA <br />-Water truck akdown : Scraper Work Team Support Equipment Road Maintenance Equipment <br /> Scraper Dozer Load area Dump area Grader Water truck <br />Import data filename : scraper2 NA NA NA NA NA <br />% Utilization-machine : 100 NA NA NA NA NA <br />-Ripper attachment : NA NA NA NA NA NA <br />Ownerhip cost/hour : $55.31 NA NA NA NA NA <br />Operating cost/hour : $125.95 NA NA NA NA NA <br />Ripper op. cost/hour : NA NA NA NA NA NA <br />Operator cost/hour : $32.96 NA NA NA NA NA <br />Unit subtotals : $214.22 NA NA NA NA NA <br />Number of units : 2 0 0 0 0 0 <br />Group subtotals : Work : $428.45 Support : $0.00 Maintenance : $0.00 <br />Total work team cost/hour : $428.45 <br />X.X <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 25,000 LCY factor : NA volume : 25,000 LCY <br />Permit/job # :M1997058 <br />Abbreviation :none <br />Filename :M058-020 <br />Source of quantity take-off :DBMS <br />Source of estimated swell factor : NA