Laserfiche WebLink
Basic machine : Cat D8R Series // - 8SU (200, Horsepower : 310 <br />Blade type : Semi-Universal <br />Attachment no. 1 4 FOPS Cab Shift basis : 1 per day <br />Attachment no. 2:3-shank ripper <br />volume : 740 LCY factor : NA volume : 740 LCY <br />Source of estimated volume :Applegate <br />Source of estimated swell factor :NA <br />HOURLY PRODUCTION ,.:, <br />Job Condition Correction Factors :. ,:..: <br />Source <br /> <br />Avera <br />h di Operator skill : 0.75 (avg.) <br />ge pus <br />stance : 150 feet Material consistency : 1.00 (Cat HB) <br />Unadjusted hourly production : 634.3 LCY/hr Dozing method : 1.00 <br />(gen.) <br /> <br />Material consistency description : Visibility: 1.00 (avg.) <br /> <br />Consolidated stockpile Job efficiency : 0.83 (lshiff/day) <br /> Spoil pile : 0.70 (fnd-mt) <br /> <br />Ave <br />h Push gradient : 1.00 (Cat HB) <br />rage pus <br />gradient : 0.00 % (pos) <br /> Altitude : 1.00 (Cat HB) <br />A <br />i <br />verage s <br />te altitude : 6,000 feet Material weight : 0.90 (Cat HB) <br /> <br />M <br />t <br />i <br />l Blade type : 1.00 (S/SU/U) <br />a <br />er <br />a <br />weight : 2,550 Ibs/LCY Net correction : 0.39 <br />Weight description <br />Earth - Dry packed Adjusted unit production : 249 <br />21 LCY <br /> . /hr <br /> Adjusted fleet production : 249.21 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) Total job time : 2.97 Hours <br />Unit cost : $0.670 /LCY Total job cost : $496 <br />