My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-08-06_PERMIT FILE - M2008006
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2008006
>
2008-08-06_PERMIT FILE - M2008006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:35:14 PM
Creation date
8/8/2008 1:09:48 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008006
IBM Index Class Name
PERMIT FILE
Doc Date
8/6/2008
Doc Name
Second Adequacy Review
From
DRMS
To
Connell Resources, Inc.
Email Name
PSH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Basic machine : Cat D8R Series // - 8SU (200, Horsepower : 310 <br />Blade type : Semi-Universal <br />Attachment no. 1 4 FOPS Cab Shift basis : 1 per day <br />Attachment no. 2:3-shank ripper <br />volume : 740 LCY factor : NA volume : 740 LCY <br />Source of estimated volume :Applegate <br />Source of estimated swell factor :NA <br />HOURLY PRODUCTION ,.:, <br />Job Condition Correction Factors :. ,:..: <br />Source <br /> <br />Avera <br />h di Operator skill : 0.75 (avg.) <br />ge pus <br />stance : 150 feet Material consistency : 1.00 (Cat HB) <br />Unadjusted hourly production : 634.3 LCY/hr Dozing method : 1.00 <br />(gen.) <br /> <br />Material consistency description : Visibility: 1.00 (avg.) <br /> <br />Consolidated stockpile Job efficiency : 0.83 (lshiff/day) <br /> Spoil pile : 0.70 (fnd-mt) <br /> <br />Ave <br />h Push gradient : 1.00 (Cat HB) <br />rage pus <br />gradient : 0.00 % (pos) <br /> Altitude : 1.00 (Cat HB) <br />A <br />i <br />verage s <br />te altitude : 6,000 feet Material weight : 0.90 (Cat HB) <br /> <br />M <br />t <br />i <br />l Blade type : 1.00 (S/SU/U) <br />a <br />er <br />a <br />weight : 2,550 Ibs/LCY Net correction : 0.39 <br />Weight description <br />Earth - Dry packed Adjusted unit production : 249 <br />21 LCY <br /> . /hr <br /> Adjusted fleet production : 249.21 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) Total job time : 2.97 Hours <br />Unit cost : $0.670 /LCY Total job cost : $496 <br />
The URL can be used to link to this page
Your browser does not support the video tag.