Laserfiche WebLink
Agency or organization name : DRMS <br />Permit or other job action : New Permit Application <br />Task description :Processing Plant - replace topsoil <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D8R Series 11 - 8SU (200, Horsepower : 310 <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2:3-shank ripper <br />volume : 2,300 LCY <br />factor : NA volume : 2,300 LCY <br />Source of estimated volume :Applegate <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br />Average push distance : 300 feet <br />Unadjusted hourly production : 291.4 LCY/hr <br />Material consistency description <br />Consolidated stockvile <br />O <br />Average push gradient : 0.00 % (i <br />Average site altitude : 6,000 feet <br />Material weight:- 2,550 Ibs/LCY <br />Weight description : <br />Operator skill : 0.75 <br />Material consistency : 1.00 <br />Dozing method : 1.00 <br />Visibility : 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.60 <br />Push gradient : 1.00 <br />Altitude : 1.00 <br />Material weight : 0.90 <br />Blade type : 1.00 <br />Net correction : 0.34 <br />(Cat HB) <br />(gen.) <br />(avg.) <br />(1 shitilday <br />(fnd-so <br />(Cat HB) <br />(Cat HB) <br />(Cat HB) <br />Earth - Dry packed Adjusted unit production : 98.13 LCY/hr <br />Adjusted fleet production : 98.93 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) Total job time : 23.44 Hours <br />Unit cost : $1.702 /LCY Total job cost : $3,915