My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-08-06_PERMIT FILE - M2008006
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2008006
>
2008-08-06_PERMIT FILE - M2008006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:35:14 PM
Creation date
8/8/2008 1:09:48 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008006
IBM Index Class Name
PERMIT FILE
Doc Date
8/6/2008
Doc Name
Second Adequacy Review
From
DRMS
To
Connell Resources, Inc.
Email Name
PSH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agency or organization name : DRMS <br />Permit or other job action : New Permit Application <br />Task description Scarify Processing Plant and Product Stockpile Area <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D8R Series 11 - 8SU (200: Horsepower : 310 <br />Blade type : Semi-Universal <br />Attachment no. 1 :ROPS Cab Shift basis : 1 per day <br />Attachment no. 2:3-shank ripper <br /> Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $57.13 NA <br /> Operating cost/hour : $77.13 100 <br /> Ripper op. cost/hour : $6.71 100 <br /> Operator cost/hour : $32.78 NA <br /> Total unit cost/hour : $173.74 Total fleet cost/hour : $173.74 <br />.:: :.::::...:...::. ...... <br /> <br />::: <br /> <br />MATERIAL QUANTITIES <br />:.. ;:; .::.......:.;.;.::.. <br />::.:.. ::.:.:.......:::. <br />,:..::..:...::: <br /> <br /> <br />... <br />Initial Swell Loose <br />volume : 1,597 LCY factor : NA volume : 1,597 LCY <br />Source of estimated volume :Applegate <br />Source of estimated swell factor : NA <br />:._ <br /> <br />HOURLY PRODUCTION <br />:xX <br />_ <br />Job Condition Correction Factors <br /> <br />;,, <br />Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 50 feet Material consistency : 1.00 (Cat HB) <br />Unadjusted hourly production : 1,400.0 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility: 1,00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (lshiff/day) <br />Consolidated stockpile Spoil pile : 0 <br />80 (ind-rf) <br /> . <br /> Push gradient : 1.00 (Cat 118) <br />Average push gradient : 0.00 % (pos) Altitude : 1.00 (Cat H13 <br />B) <br />Average site altitude : 6,000 feet Material weight : 0.90 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,550 lbs/LCY Net correction : 0.45 <br />Weight description <br />Earth - Dry packed Adjusted unit production : 628 <br />62 LCY/hr <br /> . <br /> Adjusted fleet production : 628.62 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) Total job time : 2.54 Hours <br />Unit cost : $0.276 /LCY Total job cost:--- $441 <br />
The URL can be used to link to this page
Your browser does not support the video tag.