Laserfiche WebLink
Agency or organization name : DBMS <br />Permit or other job action : New Permit Application <br />Task description : Place Topsoil - Remaining Areas <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D8R Series 11 - 8SU (200; Horsepower : 310 <br />Blade type : Semi- <br />Attachment no. 1 :ROPS Cab Shiftbasis : 1 per day <br />Attachment no. 2:3-shank ripper <br />volume : 4,000 LCY factor : NA <br />volume : 4,000 LCY <br />Source of estimated volume :Applegate <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 300 feet Material consistency : 1.00 (Cat HB) <br />Unadjusted hourly production : 291.4 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (lshifl/day) <br />Consolidated stockpile Spoil pile : 0 <br />70 (fnd-mf) <br /> . <br /> Push gradient : 1.00 (Cat HB) <br />Average push gradient : 0.00 % (pos) Altitude : _ <br />1.00 (Cat HB) <br />Average site altitude : 6,000 feet Material weight : 0.90 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,550 Ibs/LCY Net correction : 0.39 <br />Weight description <br />Earth - Dry packed Adjusted unit production : 114.49 LCY/hr <br /> Adjusted fleet production : 114.49 LCY/hr <br />JOB TIME AND-Cos <br />T <br />Fleet size : 1 Dozer(s) Total job time : 34.94 Hours <br />Unit cost : $1.459 /LCY Total job cost : $5,836 <br />