Laserfiche WebLink
Agency or organization name : DBMS <br />Permit or other job action : New Permit Application <br />Task description :Replace Topsoil - Sedimentation Ponds <br />HOURLY EQUIPMENT COST <br />volume : 740 LCY <br />Basic machine : Cat D8R Series ll - 8SU (200,1 Horsepower : 310 <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2:3-shank ripper <br />-.1. WOW <br />factor : NA volume : 740 LCY <br />Source of estimated volume: Applegate <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 150 feet Material consistency : 1.00 (Cat HB) <br />Unadjusted hourly production : 634.3 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility: 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (lshift/day) <br />Consolidated stockpile Spoil pile : 0.70 (fnd-mo <br /> <br /> Push gradient : 1,00 (Cat HB) <br />Average push gradient : 0.00 % (pos) Altitude : 1.00 (Cat HB) <br />Average site altitude : 6,000 feet Material weight : 0.90 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,550 Ibs/LCY Net correction : 0.39 <br />Weight description <br />Earth - Dry packed <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) <br />Adjusted unit production : 249.21 LCY/hr <br />Adjusted fleet production : 249.21 LCY/hr <br />Total job time : 2.97 Hours <br />Unit cost : $0.670 /LCY Total job cost : $496