Laserfiche WebLink
THE INFORMATION ON THIS PAGE DOES NOT NEED TO BE HELD CONFIDENTIAL <br /> 6 <br /> 3. Describe the estimated topsoil depth and how topsoil will be salvaged,stockpiled and redistributed for the re-establishment of <br /> vegetation. Specify approximate topsoil redistribution depth: <br /> Please see attached Exhibit C "Supplemental Information" Section IV"Operation and Reclamation Measures",Item No.3. <br /> - <br /> 4. Describe how drill holes will be plugged(refer to Rule 5.4 of the Rules for required abandonment procedures): <br /> Please see attached Exhibit Q"Supplemen:al In mIMQ^ Item No 4 <br /> 5. Describe how portals,adits,shafts,ponds,excavations,or other disturbances will be reclaimed(refer to Rule 3 and Rule 5 for <br /> specific reclamation.performance standards). You may wish to contact the Division for closure specifications. <br /> Please acc attached Exhibit Q-"Supplemental ^ Reclamation Measures".I <br /> III <br /> 6. Describe how roads will be reclaimed or returned to their pre-prospecting(or better)condition: <br /> Please see attached Exhibit C-"Supplemental Information",Section IV"Operation and Reclamation.Measures",Item No.6. <br /> k <br /> I <br />