My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
- 7/17/2008, 11:32:09 AM-JWD
DRMS
>
Public
>
- 7/17/2008, 11:32:09 AM-JWD
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/28/2020 7:44:29 AM
Creation date
7/17/2008 2:14:00 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2008046
IBM Index Class Name
Permit File
Doc Date
7/1/2008
Doc Name
New NOI- Non. Conf.
From
AMSO
To
DRMS
Email Name
SSS
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THE INFORMATION ON THIS PAGE DOES NOT NEED TO BE HELD CONFIDENTIAL <br /> 7 <br /> • 7. List the seed mixture to be used in the re-establishment of vegetation. See the attached seed mixture calculation to obtain <br /> PLS/acre. For assistance with formulating seed mixtures and rates,contact the local NRCS if on private land, BLMIUSFS if <br /> on public land or State Land Board if on state land. <br /> A. Provide plant name and seeding rate <br /> Plant Name Seeding Rate(PLS/acre) <br /> Please see attached Exhibit C-" upplemental Information",Section IV E <br /> "Operation and Reclamati n Measures",Item No.7.A. <br /> l <br /> • B. Describe the method for seed bed preparation,and application method for s/forb seeding: <br /> l3 e p P � PP � g <br /> Please see attached Exhibit G "Supplemental Information" Section IV"Operation and Reclamation Measures" Item No.7.B, <br /> V. TERMS AND CONDITIONS FOR PROSPECTING OPERATIONS. <br /> I. Reclamation measures shall be fulfilled i ':a timely manner and completed within five(5)years of completion of prospecting <br /> activities. <br /> 2_ The prospecting operations described in this Notice will be conducted in such a manner as to minimize surface disturbances. <br /> In addition to the measures required in Rule 5,precautions to be taken include: <br /> A. Confinement of operations to areas near existing roads or trails,where practicable. Existing roads which are to remain as <br /> permanent roads after prospecting activities are completed shall be left, in a condition equal to or better than the pre- <br /> prospecting condition, <br /> • B. Drilling shall be conducted in such a way as to prevent cuttings and fluids from directly entering any dry or flowing <br /> stream channel. Drill cuttings must be spread to a depth no greater than one-half(112) inch or buried in an approved <br /> disposal pit, <br /> I l <br />
The URL can be used to link to this page
Your browser does not support the video tag.