My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
- 7/17/2008, 11:32:09 AM-JWD
DRMS
>
Public
>
- 7/17/2008, 11:32:09 AM-JWD
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/28/2020 7:44:29 AM
Creation date
7/17/2008 2:14:00 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2008046
IBM Index Class Name
Permit File
Doc Date
7/1/2008
Doc Name
New NOI- Non. Conf.
From
AMSO
To
DRMS
Email Name
SSS
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THE INFORMATION ON THIS PAGE DOES NOT NEED TO BE HELD CONFIDENTIAL <br /> S <br /> i <br /> G. Total project area to be disturbed mi (acres) <br /> H. Describe the equipment to be used for the prospecting operations: <br /> Commercial construction equipment(dozer,backhoe grader dum_,p trucks will be used to construct,pads and roads-; <br /> _Standard truck-mounted drilling equipment(rotary and core drilling rigs)will be used to drill test holes and wells. <br /> Standard truck-mounted pump rig,or equivalent,will be used to set well pumps and hydraulic testing equipment. <br /> Standard truckstvans equipped to conduct downhole logging will be used to perform downhole logging and testing. TM <br /> Commercial water truck will be used to haul water to and from the site. Commercial sewage disposal trucks will be used to <br /> service portaele toilets. <br /> 1. Describe and locate any structures to be constructed(i.e.stockpiles,ponds,impoundments): <br /> Topsoil removed in support of pad and road construction will be stockpiled at each pad and properly protected for replacement during site <br /> reclamation. Other material generated during pad and road construction will be stockpiled at each pad separate from soil stockpiles. <br /> Please see attached Exhibit C-"Supplemental Information",Section III"Project Description",Item No.5.for additional details. <br /> J. Describe anticipated relationship to surface water and groundwater(proximity to streams,penetration of ground <br /> water aquifers): <br /> Please see attached Exhibit C-"Supplemental Information",Section III"Project Description",Item No.6,J. <br /> S <br /> IV. OPERATION AND RECLAMATION MEASURES: <br /> I. The Board suggests that a photographic record of the pre-prospecting and post-prospecting conditions be kept by the <br /> prospector. These photos should be taken from the same location and by the same method to clearly show the pre-prospecting <br /> condition of the land and the reclamation efforts. Upon completion of reclamation and request for bond or surety release,the <br /> Board may consider the photos as evidence of adequate reclamation,and thus,be We to act more quickly on the request for <br /> release. <br /> 2. Provide a description of the native vegetation of the area to be disturbed, including tree, shrub,and grass communities of the <br /> area. Color photographs, sufficient to adequately represent the ecology of the site and adequately labeled (including date, <br /> orientation and location), may be used in lieu of a written description. Based on the quality of the photographs, the Division <br /> may require additional detail. <br /> Please see attached Exhibit C-"Supplemental Information",Section IV"Operation and Reclamation Measures",Item No.2. <br /> • I <br /> i <br /> { <br /> e <br />
The URL can be used to link to this page
Your browser does not support the video tag.