Laserfiche WebLink
J <br />G. Total project area to be disturbed _ 0. 4 9___.___ (acres) <br />H. Describe the equipment to be used for the prospecting operations: <br />1- _. Self-Contained drill rig ontandem,-_axel,, truck-„? <br />4??$ pick-up truck <br />1- 4x4 pick-up truck for Geologist <br />1- Bobcat skid-steer and or back-hoe for road repair and mud pits (if needed) <br />1- 2500 oral. water truck (if needed <br />1. Describe and locate any structures to be constructed (i.e. stockpiles, ponds, impoundments): <br />If_water ,is encountered a portable stock tank will be used until a <br />mud pit is constructed. The mud pit dimensions are in III.6.C <br />total acres = 0.05 <br />J. Describe anticipated relationship to surface water and groundwater (proximity to streams, penetration of ground <br />water aquifers): <br />*see attachment C "Surface and Ground-Water Hydrology" <br />IV. OPERATION AND RECLAMATION MEASURES: <br />1. The Board suggests that a photographic record of the pre-prospecting and post-prospecting conditions be kept by the <br />prospector. These photos should be taken from the same location and by the same method to clearly show the pre-prospecting <br />condition of the land and the reclamation efforts, Upon completion of reclamation and request for bond or surety release, the <br />Board may consider the photos as evidence of adequate reclamation, and thus, be able to act more quickly on the request for <br />release, <br />2. Provide a description of the native vegetation of the area to be disturbed, including tree, shrub, and grass communities of the <br />area. Color photographs, sufficient to adequately represent the ecology of the site and adequately labeled (including date, <br />orientation and location), may be used in lieu of a writteri description. Based on the quality of the photographs, the Division <br />may require additional detail. <br />*see attachment D "Existing Conditions"